UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20211028

2021/10/28 (Thursday)

Previous Day

  • Lab in-personnel: Matt, Himangshu, Zach, Giulia
Status Run 75 prep.
All mixture is in dump. Fridge isolated. 1K Pot isolated. LN2 Trap 2 still has contaminants in it. MB in pit, clean tent erected. Cryostat vacuum jacket (CVJ) pumped out. IVC open. Tower removed.
Installed Tower in fridge yesterday.
1330 Tower installation: tape Tower thermometer wire to side of 30 mK can
1430 Bring SQUET ZC-39 to wirebonder lab for modifications: reduce shunt on all four phonon channels to 6.7 mΩ. Wirebonder power 475/350, bond time 40/40. Scraped copper with hypodermic first.
1600 Finish installing 100mK shield.
1630 Electrical check of all phonon-related lines on ZC-39, all good.

Next Day