UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210613

2021/06/13 (Sunday)

Previous Day

  • Lab in-personnel: Zach
  • Virtual partner: Matt
Status Run 74 in progress. First cooldown after IVC rebuild. Started circulation yesterday.
1640 Zach enters lab.
1645 Tower/MC/Coldplate = 225/31.8/192 mK, Still = 1.36 K / 0.085 mbar / 0 mW, G1/G2= 70/77 mbar, 1K Pot = 1.66 K / 28±2 mbar.
Tower temperature is I think implausibly high. I think if the temperature was that elevated the Coldplate would be hotter. (Should look more at past runs to try to verify this.) So I suspect that there are problems with the thermometer.
1715 Begin LHe transfer @ MB = 13.6%
1750 Ended LHe transfer @ MB = 87.6%
1753 Begin LN2 transfer
1803 Ended LN2 transfer
1807 Zach leaves lab.

Next Day