start › cdms › k100 › run_diary › 20191029

2019/10/29 (Tuesday)

Previous Day

Status: Mixture cryocleaned 4 times. IVC leak-checked at 300K. Beginning 2nd attempt at Run 71 cooldown.
0920 Turbo pump on IVC = 22 nbar. IVC = 860 nbar with turbo valved out for several minutes.
0920 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.9%
0930 Increase V6 → 13.0% to restart flow
0940 Increase V6 → 13.1% to restart flow
0950 Increase V6 → 13.2% to speed up flow
1015 Main bath raised and secured. Fridge insert was slightly misaligned from fridge frame. To fix this, we first put in the small screws part way to attach fridge insert to dewar. Then we loosened the fridge insert mount screws which set the insert radial position, so the insert was free(ish) to rotate. Then put in medium and large screws to attach dewar to frame. Finally we tightened the small screws attaching insert to dewar and re-tightened fridge insert mount screws.
1025 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 555-805 mbar. Pump mixture to dump.
Removed 8.7 mbar.
1055 Check warm LN2 Cold Trap 1: 8.7 mbar. Pump out Trap 1.
1100 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.9%
1105 Increase V6 → 13.1% to restart flow
1120 Increase V6 → 13.2% to restart flow
1125 Increase V6 → 13.3% to speed up flow
1200 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 560-670 mbar. Pump mixture to dump.
Removed 9.1 mbar.
1215 Check fridge pressures: LHe trap/Condenser/Still = 2.5/0.6/0.6 mbar. Pump out with scroll pump.
Throughput test procedure, Cold Trap 2:
  1. All mixture in dump, LN2 trap 2 cold, condenser & still valves open (3He pump on - optional)
  2. Open V9, V13b, V12b+speedivalve, V3. Wait for G1 to be close to G2.
  3. Close V13a+speedivalve and V3, open V1
  4. monitor G1
1230 Perform mixture throughput test at MC = 300 K using above procedure with 3He pump on. Let G1 rise to 580 mbar before Step 3, then it falls to 43 mbar and starts to rise. Throughput = 6.6 mbar/min.
1245 Pump mixture out of fridge and cold LN2 Trap 2 to dump.
1245 With 1K Pot speedivalve and needle valve closed, pump on Main bath with scroll pump.
Once P2 < 100 mbar, open 1K pot speedivalve and needle valve (5 turns) to pump out 1K pot volume to < 1 mbar on P2.
1250 Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar.
1300 Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar.
1305 Pressurize main bath and 1K Pot (both sides) with helium to 365 mbar +1atm on G3, then close 1K Pot speedivalve and needle valve.
1310 Check warm LN2 Cold Trap 1: 9.1 mbar. Pump out Trap 1.
a little worrying that this is not coming down. I tightened the o-ring connections on the Still pumping line above the GHS. Maybe that will help. I guess I'll try LN2 transfer anyway.
1310 Turbo on IVC = 19 nbar. With turbo valved out for a few minutes, IVC = 540 nbar.
1315 Let 5.4 mbar He exchange gas into IVC
1325 As on 2019 Sep 20 during previous Run 71 cooldown, we will flow mixture through the fridge during LN2 cooldown. Let mixture from dump through cold LN2 Trap 2 to fridge, both sides. Then we'll isolate the sides and circulate with V6 open partially and mix open to dump. V9, V13b, V12b+speedi, V1, Condenser speedi, Still gate valves open, 3He pump on. Now open V6 to 12.8%.
1330 Circulation pressures settling to G2/G1/P1 = 647/722/20 mbar
1335 MC(Cernox) = 296.8 K, Sorb = >249 K (max), IVC = 5.4 mbar, G2/G1/P1 (circulation) = 647/723/9.0 mbar, Level resistor = 0.983 kΩ
1340 Begin LN2 transfer
1350 MC(Cernox) = 296.4 K, Sorb = >249 K (max), IVC = 5.4 mbar, G2/G1/P1 (circulation) = 646/723/38 mbar, Level resistor = 0.997 kΩ
1350 Close V12b speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 11.8 mbar/min. Open V12b speedivalve again.
1355 MC(Cernox) = 293.5 K, Sorb = >249 K (max), IVC = 5.4 mbar, G2/G1/P1 (circulation) = 647/723/75 mbar, Level resistor = 1.009 kΩ
1405 MC(Cernox) = 279.2 K, Sorb = >249 K (max), IVC = 4.0 mbar, G2/G1/P1 (circulation) = 647/722/(off scale) mbar, Level resistor = 1.020 kΩ
1415 MC(Cernox) = 259.9 K, Sorb = >249 K (max), IVC = 3.4 mbar, G2/G1/P1 (circulation) = 647/721/(off scale) mbar, Level resistor = 1.065 kΩ
1415 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 13.8 mbar/min. Open V12b speedivalve again.
1430 MC(Cernox) = 248.2 K, Sorb = >249 K (max), IVC = 3.0 mbar, G2/G1/P1 (circulation) = 645/719/(off scale) mbar, Level resistor = 1.128 kΩ
1430 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 18.4 mbar/min. Open V12b speedivalve again.
1445 MC(Cernox) = 182.9 K, Sorb = >249 K (max), IVC = 2.5 mbar, G2/G1/P1 (circulation) = 643/715/(off scale) mbar, Level resistor = 1.193 kΩ
1445 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 24.6 mbar/min. Open V12b speedivalve again.
1505 MC(Cernox) = 152.5 K, Sorb = 224.4 K, IVC = 2.2 mbar, G2/G1/P1 (circulation) = 638/709/(off scale) mbar, Level resistor = 1.251 kΩ
1505 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 29.0 mbar/min. Open V12b speedivalve again.
looks like the LN2 Dewar is almost empty
1515 Pause transfer, disconnect LN2 Dewar to refill it.
1530 MC(Cernox) = 128.5 K, Sorb = 170.2 K, IVC = 2.2 mbar, G2/G1/P1 (circulation) = 628/698/(off scale) mbar, Level resistor = 1.177 kΩ
1530 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 41.1 mbar/min. Open V12b speedivalve again.
1605 MC(Cernox) = 108.3 K, Sorb = 150.1 K, IVC = 1.9 mbar, G2/G1/P1 (circulation) = 611/680/(off scale) mbar, Level resistor = 1.172 kΩ
1605 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 41.0 mbar/min. Open V12b speedivalve again.
1615 Restart LN2 transfer with freshly filled Dewar
1625 MC(Cernox) = 100.4 K, Sorb = 144.9 K, IVC = 1.9 mbar, G2/G1/P1 (circulation) = 603/671/(off scale) mbar, Level resistor = 1.267 kΩ
1625 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 39.3 mbar/min. Open V12b speedivalve again.
1645 MC(Cernox) = 93.6 K, Sorb = 134.2 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 593/659/(off scale) mbar, Level resistor = 1.284 kΩ
1705 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 33.2 mbar/min. Open V12b speedivalve again.
1708 MC(Cernox) = 88.4 K, Sorb = 127.8 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 585/649/(off scale) mbar, Level resistor = 1.292 kΩ
1730 Close V12b speedivalve for 2 minutes to assess throughput. G1 falls at 26.7 mbar/min. Open V12b speedivalve again.
Seems like we're losing throughput.
1736 MC(Cernox) = 84.1 K, Sorb = 123.7 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 575/639/(off scale) mbar, Level resistor = 1.302 kΩ
1745 MC(Cernox) = 83.0 K, Sorb = 122.8 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 572/636/(off scale) mbar, Level resistor = 1.305 kΩ
1746 Stop LN2 transfer. Put Ping-pong ball on MB exhaust port. Close V6 and stop circulation pump.