UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20200923

2020/09/23 (Wednesday)

Previous Day

  • Lab in-person: Zach
  • Virtual partner: Matt
Setup Run 73. DIB 1/3/4 → Stripline 43/48/41 → pi-filters 1/2/3 → Cable 3/1/2 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)-master; DCRC33(2) → HV control. DCRCs on. Lead/poly shield erected (4 lead walls, 2 poly walls).
A few days after recooling. We can't seem to cool below around 62 mK (c/w 50 mK base earlier). We've seen temperature excursions suggesting helium films but they seem to have calmed down.
Moved source to y = -17.992 mm (not corrected for thermal contraction) last night
0716 MB = 35.4%
0720 Tower had cooled to 65.5 mK but now there's an excursion happening, temperature rising
0720 All channels are railed. Zap DCRC1&4 SQUIDs.
0850 Tower = 70-72 mK, wandering in that range. Phonon channels all look OK.
1200 Tower = 69-70 mK, not very stable and significantly warmer than yesterday. Not worth redoing IbIs to reset QET biases. We probably need to try to get the helium out of the IVC
1230 Stop circulation to warm up - close V6. Still pressure starts to rise. After a few minutes G1/G2 pressures fall, Tower temperature rises.
1245 Tower = 0.44 K and rising, G1(condenser) = 66 mbar and falling, P1(still) = 45 mbar and rising.
1245 Turn on MC/Still Heaters → 20/30 mW. Tower temperature rises immediately.
1250 Tower = 1.7 K and rising, G1(condenser) = 55 mbar and leveling, P1(still) → offscale. G1(fridge) → 105 mbar. 1K Pot temperature rises a little.
1255 At Tower = 2.2 K, turn on DCRC1 LEDs with increased duty cycle: width/rate = 100/1000 us instead of standard 100/10000 us. Tower temperature rises more quickly.
1305 Tower = 2.84 K, leveling out. G1(condenser) = 81 mbar and now rising.
1305 Open V3 to short Still and Condenser sides of fridge. G1(condenser) rises, so apparently Still side pressure was higher.
1310 Turn off LEDs to see what happens. Tower temperature falls, 2.85→2.54 mK
1310 Turn on LEDs with increased duty cycle: width/rate = 500/1000 us instead of standard 100/10000 us. Tower temperature rises quickly → 3.5 K. Fridge pressure rising.
1320 Tower = 3.66 K and flat-ish, G1(fridge) = 150 mbar. 1K Pot = 1.69 K.
1320 Let's stop pumping on the 1K Pot. Close V4a. Since the Speedivalve and Needle valve are open, Pot should fill with LHe. Can watch pressure at G3, should eventually equalize with MB and rise above 1atm. 1K Pot → 2 K. Fridge pressure rises. Tower temperature was flat, now rising again.
1325 G3(1K Pot) rises above 0 mbar+1atm
1330 Tower = 3.85 K and rising, G1(fridge) = 285 mbar and rising, 1K Pot = 1.69 K.
1410 Tower = 4.52 K and flat, G1(fridge) = 875 mbar and leveling, 1K Pot = 4.34 K and flat.
1410 Try turning off LEDs for a little bit; Tower drops to around 4.1 K. Turn them back on.
1350 Zach body temp = 98.6
1416 Zach arrives at lab.
1416 MB = 24.8%
1423 MC (Cernox) = 4.08K
1425 Fridge pressures getting too high, G1>900mbar. Open V14 to dump, pressures dropped to 500s.
1428 Opened 1K pot needle valve by one full turn.
1430 Closed of Helium 4 pump and its recovery valve.
1434 Coldplate = 14 and rising, Still = 85
1438 Begin filling LN2 cold trap dewar.
1447 Turbo on IVC = 2.5 nbar.
1448 IVC with turbo valved out for 1min = 46 nbar.
1449 Ended LN2 transfer.
1450 1K pot temp > 7K, started increasing when I began the LN2 transfer, not sure why.
1512 Let some exchange gas into the IVC, 1.6 ubar. MC temp dropped to 4.8K and 1K pot at 4.8K.
1528 Brought new helium cylinder back.
1530 Zach leaves lab.
1610 Zach body temp = 97.2
1535 Recovery = 383766.2 / 17 cuft/hr
1620 MC(Cernox) = 4.82 K, G1(fridge+dump) = 574 mbar, 1K Pot = 4.96 K, all flat.
1625 Try turning off LEDs for a minute or so; MC→4.77 K. Turn them back on.
1630 Try turning off MC/Still heaters for a minute or so; MC→4.42 K. Fridge pressure fell a little too. Turn heaters back on.
1716 MB = 20.5%, Recovery = 383794 / 16 cuft/hr
1816 MB = 19.1%, Recovery = 383810.1 / 16 cuft/hr
2016 MB = 16.2%, Recovery = 383842.4 / 15.9 cuft/hr
2200 MC(Cernox)/1K Pot/Sorb = 4.82/5.03/6.3 K, G1(fridge+dump) = 577 mbar
2116 MB = 14.8%, Recovery = 383858.6 / 16.2 cuft/hr
2216 MB = 13.4%, Recovery = 383875.1 / 16.4 cuft/hr
2316 MB = 12%, Recovery = 383891.3 / 16.3 cuft/hr

Next Day