UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20190714

2019/07/14 (Sunday)

Previous Day

Setup DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer ?/3/2 → HVConn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)
DCRC33(2) → 1kV power supply → HV input

Three walls of the lead/poly shield are up.
0940 Restart fridge VIs through Remote Desktop connection. Apparently spa-vuk1 rebooted around 2:10 am.
1335 Tower/MC/Coldplate = 38.4/29.3/196 mK, Still = 1.35 K / 0.18 mbar / 6 mW, G1/G2 = 212.0/199.4 mbar, 1K Pot = 1.614 K / 19 mbar. MB = 28.4%
1341 Fill LN2 Coldtrap bath from bomb dewar.
1412 Start LHe transfer. MB = 27.5%. We stopped due to LHe leaking out of the joint between the transfer stick pieces. After disconnecting there appeared to be a buildup of ice at the end of the Dewar piece where it connects to the cryostat piece. MB = 38.3
1605 Start LHe transfer. MB = 38.3
1647 End LHe transfer. MB = 90.4
2139 Start a sequence of 8 @ 50 min series at HV = 180→306V, rate 2.49V/min, with 10% prebias for 2 minutes, flash at end with 30 min wait.
CDMS detector: Driver Gains = 1x, DCRC4/1 QET biases = (490/400/495)/(420/480/450) uA, Front-End Gains = (2/2/3)/(5/5/5)
1000 BOR, 5Hz InRun randoms, trigger on DCRC1pD threshold = 3, baseline/sample length = 20/16 (standard 16/5),phonon pre-pulse 500 (standard is 500).
Use sequence HVdrift_8X180V_2p49VPM_loopversion_prebias_10_2_dur_50min_flashDCRC_1_4.msl

Next Day