UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20231011

2023/10/11 (Wednesday)

Previous Day

* Lab in-personnel: Zach, Ping

1344 Check contents of warm LN2 Trap 1: 13.5 on G1. Pump it out with the scroll pump.
1347 G1 = 2.3 mbar and stable, stop pumping on Trap 1
1354 Insert cold trap 1 into and begin filling the LN2 cold trap dewar with LN2
1403 Begin cryocleaning mixture through cold trap 1 following the procedure in procedure:cryoclean_mixture
1410 Open V6 to 11.9% to restart flow
1411 Raise Main bath
1419 Open V6 to 12.1% to restart flow
1423 Begin installing bolts for main bath, starting with the 2 large, then medium, then small
Just installing the bolts in order usually results in some small bolts not fitting well, I managed to fit all small bolts flush this time with a more complicated technique.
After installing the large and medium bolts flush, then installing the small bolts partway, I loosened the medium and large bolts and dropped the main bath a very small amount, making sure that the small bolts would still not bear the weight.
Then I screwed the small bolts flush, raised the bath a small amount, and repeated until the cables holding the bath up were tight.
Then I alternated between tightening the medium bolts and small bolts until both sets were snug, finally I tightened the large bolts and let off a little tension in the cables.
1458 Open V6 to 12.3% to restart flow
1509 End cryocleaning mixture through trap 1. Pump mixture to dump
1522 P1 = 0.140 mbar, G1 = 1.8 mbar and stable. Close all valves and turn off 3He pump, leaving 714.4 mbar in dump
1524 Remove cold trap 1 from the LN2 bath to warm up overnight
1528 Bring Californium source to the 4th floor lab using the lead+poly transport cylinder.

Next Day