2021/05/18 (Tuesday)
- Lab in-person: Zach
- Virtual partner: Ruiren
| Status | Run 74 in progress. Warmed up after 3rd appearance of IVC leak at 4K. Cryostat Vacuum Jacket pumped out. All IVC sections and stripline tube have been removed. |
|---|---|
| Zach polishes surfaces of 100mK and 30mK cans and removes indium from the flanges |