2024/07/22 (Monday)
- Lab in-personnel: Himangshu
| 1400 | IVC under turbo = 6.3e-5 mbar. |
|---|
| Detector: | S104 | Stripline | 41 | ||
| SC: | none | *293 K* | |||
| Face: | 5 | Date | 07/22/2024 | ||
| SQUET: | ZC-70 | Cable | 2 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
|---|---|---|---|---|---|
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | – k | OK |
| SQUID bias B/Ret | 19 | 34 | 4.263 k | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.542 k | OK | |
| SQUID bias D/Ret | 23 | 39 | 5.047 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | – k | OK |
| Feedback B/Ret | 2 | 18 | 25.32 k | OK | |
| Feedback C/Ret | 41 | 25 | 28.02 k | OK | |
| Feedback D/Ret | 22 | 6 | 34.07 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | OL, 101.4 ,OL, OL, OL | NOT OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 81.2, 81.6, OL, OL | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 104.5, 84.1, OL, OL | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 83.8, 84.5, OL, OL | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | 5.9K | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | 1.106 |
| LED 2 | chassis | 26 | 1.233 |
| Motor Coil X1 | 169 | 186 | |||
| Motor Coil X2 | 169 | 246 | |||
| Motor Coil Y1 | 169 | 229 | |||
| Motor Coil Y2 | 169 | 193 | |||
| Xendstop | 1k | - | |||
| Yendstop | 1k | 32 |
| 1410 | Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2 on Cable 3 |
|---|
| Detector: | S104 | Stripline | 43 | ||
| SC: | none | 293 K | |||
|---|---|---|---|---|---|
| Face: | 2 | Date | 07/22/2024 | ||
| SQUET: | ZC-13 | Cable | 3 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.580 k | OK |
| SQUID bias B/Ret | 19 | 34 | 4.832 k | OK | |
| SQUID bias C/Ret | 8 | 24 | – k | OK | |
| SQUID bias D/Ret | 23 | 39 | 4.890 k | NOT OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 18.76 k | OK |
| Feedback B/Ret | 2 | 18 | 19.82 k | OK | |
| Feedback C/Ret | 41 | 25 | – k | OK | |
| Feedback D/Ret | 22 | 6 | 20.57 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 158, 74, 69,70, 76 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 75, 75, 96, 75 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 108, 80, 61, 69 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 90, 76, 76, 76 | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| 1420 | Electrical check of ZC-31 after connecting to Stripline 48 on Tower Face 3 on Cable 1 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 48 | ||
| SC: | none | 77 K | |||
| Face: | 3 | Date | 01/24/2024 | ||
| SQUET: | ZC-31 | Cable | 1 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.21 k | OK |
| SQUID bias B/Ret | 19 | 34 | 4.03 k | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.48 k | OK | |
| SQUID bias D/Ret | 23 | 39 | 4.12 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 26 k | OK |
| Feedback B/Ret | 2 | 18 | 26 k | OK | |
| Feedback C/Ret | 41 | 25 | 27 k | OK | |
| Feedback D/Ret | 22 | 6 | 26 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 141, 68,62, 62, 70 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 67, 67, 93, 67 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 104, 71, 55, 55 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 72,73, 72, 73 | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | 6.11k | ||
| Pump out fridge lines: |
- Make sure mixture is isolated in the dump.
- Check fridge pressures by opening condenser speedivalve+V1 and still gate valve: LHe trap+Condenser(G1)/Still(P1) = no change/1700 mTorr.
- Connect scroll pump to He-4 pump line, turn it on.
- Open pump line valve, V5A, V2A, V4, wait a minute, then open V5.
- You're now pumping on the fridge lines. Wait until P1 and G1 flatten out.
- Close condenser speedivalve and still gate valve, V1, V5, V2A, V5A and close and turn off the scroll pump.
| 1530 | G1 remain at zero level. P1 stable at 1700 mTorr |
|---|---|
| 1535 | Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 cold, condenser & still valves open (3He pump on - optional)
- Open V9, V8+speedivalves, V3 and slowly open V5. Wait for G1 to be rise and then fall, close to G2.
- Close V3 and V5, open V1
- monitor G1
| 1245 | Perform mixture throughput test at MC = 300 K using above procedure with 3He pump on. Let G1 rise to 600 mbar before Step 3, then it falls to ~25 mbar on step 4 and starts to rise. Reaches ~50mbar after 6.5min Throughput = 3.8 mbar/min. (very rough estimation) |
|---|---|
| 1317 | Pump mixture back to dump: |
- Close V8 then turn on the 3He pump.
- Open V3, V5.
- Open V2 initially to marked 1, then further in steps to 30 degree, making sure G2 doesn't rise too quickly.
- Continue pumping until G1 stabilizes at a minimum value (typically a few mbar) and P1 is less than 100 mTorr.
- Stop pumping on cold trap 1, close coldtrap 1 speedivalves and V3.
- Stop pumping on fridge, close still gate valve, condenser speedivalve, V1, V5.
- Close V2 completely, close V9.