| | Leak checking inside of MB |
| 1220 | Short blast He into top of MB, leak signal steady @ 13.4 pbarL/s. |
| 1222 | Another short blast into transfer stick lifted 1 inch, steady @ 13.6 pbarL/s. |
| 1224 | Push transfer stick back down, another short blast, steady at 13.7 pbarL/s. Looks like indium seals are ok. |
| 1226 | Blast near strip line tube connection, steady @ 14.2 pbarL/s. |
| 1229 | Blast near KF flange o-ring, steady at 14.4 pbarL/s. |
| 1232 | On April 16, the background level was lower and the leak signal read 10 pbarL/s. So maybe we aren't quite sensitive enough to see this leak now (?) |
| 1239 | Pumped out He cold trap with scroll pump, pressure V1 = 7.4 mbar. |
| 1240 | Pumping out fridge lines with scroll pump. |
| 1244 | Check pressure in LN2 warm trap 1, 244 mbar pumped out with scroll pump. Continue to pump out with scroll pump. |
| 1248 | Check pressure in LN2 warm trap 2, 6.0 mbar pumped out with scroll pump. |
| 1400 | Leak checker background has decreased while hooked up to the turbo pump, steady at 1.6 pbarL/s. Turbo on IVC = 10 nbar. |
| 1450 | Stop pumping out LN2 traps. Stop turbo on IVC. Background leak on IVC = 18 pbarL/s |
| 1515 | Let mixture in from pump to both sides of fridge lines through trap 2, background leak steady at 17 pbarL/s. |
| 1516 | Pump mixture back to dump. |
| 1525 | 5 sec blast into bath from the top, steady @ 16 pbarL/s, continue to blast gas around top of fridge, slow increase but mostly steady from 18-19 pbarL/s. |