2020/02/23 (Sunday)
| Setup | Run 72. DIB 1/3/4 → Stripline 43/41/48 → Cable 3/2/1 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1). DCRCs on overnight. No shield. |
|---|---|
| 1245 | Tower/MC/Coldplate = 58.3/31.6/196 mK, Still = 1.5 K/ 0.200 mbar / 0 mW, G1/G2= 229/221 mbar, 1K Pot = 2.10 K / 24 mbar. MB = 62.7% |
| 1250 | Put LN2 Trap 2 into bath. Should raise the level a little. No LN2 in the Dewar, need to refill it tomorrow. |