Warming up after a short appeared at 77K. Also throughput was poor. Pumping out cryostat vacuum jacket.
0845 Turbo = 4.6 nbar, cryostat vacuum jacket = 120 nbar with turbo valved out
0845 MC(Cernox) = 275.7 K
Notes on channel with the short:
  • Short was DIB3pA QET to chassis. This is Side2pB.
  • Short was present at 77K, started to disappear at 100 K. Not present at room temperature.
  • During tower assembly this channel also shorted to chassis but messing with the DIB connection fixed it.
  • This channel showed significantly higher resistance on the bench than the last check after Run 62. All other channels were close to the old values.
  • The wirebonds on this channel are quite long. In order to make this an operational channel it was bonded to two stadiums of the B-ring, jumping over the A-ring.
  • In Run 62 tower assembly there were multiple times that channels shorted to chassis, though I'm not sure whether this particular one did.
  • Since pushing the DIB in at room temperature caused a short, probably making the bond bow up and hit the crown, seems reasonable that something similar happens upon cooling, when the housing shrinks more than the crystal and pushes the DIB closer.
  • Could try simply pushing the bonds down a bit, has worked in the past, as long as this doesn't break the bonds.
  • The bonding for this channel was meant to make it a readable channel. Since we probably won't look at Side2 this run, could consider jump-bonding this to another Side2 channel, simpler and more reliable bond.
  • UPDATE - it wasn't the detector, it was the side coax - see April 27
0930 Check fridge pressures: LHe trap, Condenser ~ 0.3 mbar, Still ~ 0 mbar. Pump out with scroll pump.
Throughput test procedure, Cold Trap 2:
  1. All mixture in dump, LN2 traps cold, condenser & still valves open (3He pump on - optional)
  2. Open V9, V13b, V12b+speedivalve, V3. Wait for G1 to be close to G2.
  3. Close V12b+speedivalve and V3, open V1
  4. monitor G1
0945 Perform mixture throughput test at MC = 276 K using above procedure. Let G1 rise to 567 mbar before Step 3, then it falls to 41 mbar, then rises steadily. Throughput 7.1 mbar/min. A little worse than Run 63.
0935 Lower main bath
1005 IVC open, beginning disassembly. The SQUET on DIB4 has a very bent pin, Pin 42, SQUID D return. This is Side1pF, so it's necessary. This connection showed no problems in checkouts though.
1020 Fiddle with the SQUET on DIB3, which seems to have bad pins and sometimes shows bad connections in phonon-related lines. Can cause various channels to come and go, including pC, the one that we need. Maybe the solder connections of the pins are a little loose and can be improved?
1130 On the bench we found that on ZC-74, Pin 27 (SQUID B bias) was bad, moving it a little caused the resistance to jump to MΩ. Tried heating this pin to rewet the solder - after this it seemed more stable at first but a little stress caused it to go bad as before. Tried removing this pin completely and soldering in a new one - now it's completely open. Not good.
Tested SQUET ZC-23 on bench. Same result as in the cold hardware page, SQUID A reads open but everything else OK. This SQUET has all four shunt resistances reduced to 6.7 mΩ. We'll try it as a replacement for ZC-74.
1333 Removed adaptor plate from tower
1335 Look at DIB3pA-to-chassis. No short. Try pushing in the side coax at the DIB - can make the short appear, kind of unstable.
1340 Remove side coaxes
1350 Remove detector. Inspect Side2 DIB3 (note this is the top, source-side). It's clear that the very long bond on Pin 2 is bowing up, clearly coming close to the source plate. Try pushing down on it to bend it flatter. Wound up breaking it off at the DIB. So, just pulled it off completely. The Pin 1 bond is still good - still shows continuity to DIB3pB.
1410 Reassemble tower and replace side coaxes.
1410 Tower electrical check:
Detector S101 DIB 1
side coax ST-3-3 date/who: 2018-04-23 GR MF
face 5
+lead - lead signal typical previous/now
1 2 QET A 100 to 200 Ω 401/399 Ω
2 4 QETA-B 100 to 200 Ω 2.7/3.1 kΩ
3 4 QET B 100 to 200 Ω 209/208 Ω
4 6 QETB-C 100 to 200 Ω 5.9/OL kΩ
5 6 QET C 100 to 200 Ω 494/492 Ω
6 8 QETC-D 100 to 200 Ω 3.9/4.2 kΩ
7 8 QET D 100 to 200 Ω 376/375 Ω
2 8 QETA-D 100 to 200 Ω 3.2/3.5 kΩ
9 chassis LED1 Rforward 8 to 9 MΩ 94/150 kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.04/1.04 V
chassis 9 LED1 Rreverse <1 nS 275/240 kΩ
10 chassis LED2 Rforward 8 to 9 MΩ 756/800 kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.117/1.114 V
chassis 10 LED2 Rreverse <1 nS 0.2/0.2 nS
All pins → Ground <1.0nS (Except for LED pins) all <0.3/0.5 nS
Detector S101 DIB 3
side coax ST-3-9 date/who: 2018-04-23 NM MF
face 3
+lead - lead signal typical previous/now
1 2 QET A 100 to 200 Ω 280/OL Ω
1 4 QETA-B 100 to 200 Ω 2.7 kΩ
3 4 QET B 100 to 200 Ω 129/129 Ω
4 6 QETB-C 100 to 200 Ω 3.19/3.3 kΩ
5 6 QET C 100 to 200 Ω 132/132 Ω
6 8 QETC-D 100 to 200 Ω inf/inf Ω
7 8 QET D 100 to 200 Ω inf/inf Ω
2 8 QETA-D 100 to 200 Ω inf/inf Ω
9 chassis LED1 Rforward 8 to 9 MΩ 790/790 kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.098/1.087 V
chassis 9 LED1 Rreverse <1 nS 0.3/0.1 nS
10 chassis LED2 Rforward 8 to 9 MΩ 790/790 kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.099/1.089 V
chassis 10 LED2 Rreverse <1 nS 0.2/0.3 nS
All pins → Ground <1.0nS (Except for LED pins) all <0.3/0.3 nS
Detector S101 DIB 4
side coax ST-3-10 date/who: 2018-04-23 NM MF
face 1
+lead - lead signal typical measured
1 2 QET A 100 to 200 Ω 458/457 Ω
2 4 QETA-B 100 to 200 Ω 4.33/4.5 kΩ
3 4 QET B 100 to 200 Ω 526/525 Ω
4 6 QETB-C 100 to 200 Ω open (flashing OL)
5 6 QET C 100 to 200 Ω 453/452 Ω
6 8 QETC-D 100 to 200 Ω 5.4/6.1 kΩ
7 8 QET D 100 to 200 Ω 483/482 Ω
2 8 QETA-D 100 to 200 Ω 6.22/flashing OL kΩ
9 chassis LED1 Rforward 8 to 9 MΩ open/open kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.093/open V
chassis 9 LED1 Rreverse <1 nS 0.1/0.4 nS
10 chassis LED2 Rforward 8 to 9 MΩ 787/800 kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.095/1.084 V
chassis 10 LED2 Rreverse <1 nS 0.1/0.4 nS
All pins → Ground <1.0nS (Except for LED pins) all <0.2 nS
1600 Tower reassembly complete
1635 Installing tower, 100mK stage started
1720 DIB3 SQUET plugged in. Electrical checkout OK. (SQUID A open, we knew that already.)
1730 DIB1 SQUET plugged in. Electrical checkout OK.
1740 DIB4 SQUET plugged in. Electrical checkout OK.
1740 Cross-channel checks on all 3 DIBs, all channels show continuity to at least one other channel.
1800 Start pumping IVC with scroll pump
1810 Start pumping IVC with turbo pump
Cryocleaning mixture
1005 Start cryocleaning mixture through cold LN2 Trap 2, V6 = 13.0%
1010 Increase V6 to 13.1% to speed up flow
1020 Increase V6 to 13.2% to speed up flow
1040 Increase V6 to 13.3% to speed up flow
1110 Stop cryocleaning, Trap 2 65 minutes. Pump mixture to dump.
1120 Start cryocleaning mixture through cold LN2 Trap 1, V6 = 12.9%
1125 Increase V6 to 13.2% to speed up flow
1145 Increase V6 to 13.3% to speed up flow
1245 Stop cryocleaning, Trap 1 85 minutes. Pump mixture to dump.
1315 Check pressure in warm LN2 Trap 2: 19.4 mbar. Pump out with scroll pump
1325 Start cryocleaning mixture through cold LN2 Trap 2, V6 = 12.9%
1425 Increase V6 to 13.2% to speed up flow
1535 Stop cryocleaning, Trap 2 130 minutes. Pump mixture to dump.
1730 Check pressure in warm LN2 Trap 1: 3.4 mbar. Pump out with scroll pump
1745 Check pressure in warm LN2 Trap 2: 9.0 mbar. Pump out with scroll pump

Next Day