2019/03/17 (Sunday)
| Setup | DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC50(3) DCRC33(2) → 1kV power supply → HV input note: QET biases left at 0 overnight |
|---|---|
| 1745 | Tower/MC/Coldplate = 44.8/29.9/192 mK, Still = 1.65±0.15 K / 0.150 mbar, G1/G2 = 223/199 mbar, 1K Pot = 1.78 K / 16 mbar. MB = 65.1% |
| Tower falling 0.9 mK/day | |
| 1745 | Fill LN2 cold trap bath |