UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220512

2022/05/12 (Thursday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
1604 Begin LHe transfer @ MB = 34.0%
1610 Fill LN2 cold trap bath
1630 MC/Coldplate = 28.2/146 mK, Still = 1.08 K / 0.095 mbar / 0 mW, G1/G2 = 93/102 mbar, 1K Pot = 18° / 1.53 K / 9±1 mbar
1652 End LHe transfer @ MB = 93.2%

Next Day