Previous Day
| | Status: Tower installed, 100mK stage almost finished. All mixture in dump. MB vacuum jacket has been pumped out. |
| 0835 | Remove Cf source from IVC and return source to safe |
| 0855 | Finish 100mK stage, attach 600 mK rod to ear on tower |
| 0915 | Attach 4K stage to IVC |
Note on SQUET choice: should probably use the same ones from Run 59, ZC39, ZC13, ZC26, since we know their tuning parameters. Note that there are no channels connected to DIB3 pA & pD or DIB4 pA, so if there are any sub-par SQUET channels they should be mapped to those channels if possible.
| 1223 | Attach SQUET ZC-13 to stripline 19/face 1 of tower, and attach SQUET ZC-39 to stripline 27/face 3 of the tower. Initial electrical check of DIB 1 (stipeline 19) shows that SQUID bias A to Return is open. |
| 1240 | Resistance check from breakout to cold end of stripline shows Stripline 19 SQUID RET A wire is broken. |
Plan for rerouting Stripline 19:
Bad wire = SQUID Return A. Reroute with good spare wire = QET A Return #3
for SQUET-end rerouting card:
add jumper from Pin 3 (SQUID Return A) to Pin 11 (QET A Return #3)
break off Socket 11
for D50-end rerouting card:
jump Pin 4 (QET A Return #3) on the male side (stripline side) to Pin 31 (SQUID Return A) on the female side (ebox side)
open switches (to break connections) corresponding to Pin 4 (switch U02-5) and Pin 31 (switch U09-4)
| 1350 | Finish fixing Stripline 19 rerouting boards |
| 1446 | Resistance check from breakout to cold end of stripline shows Stripline 19 Feedback RET B wire is only partially connected. |
Plan for rerouting Stripline 19:
Bad wire = Feedback Return B. Reroute with good spare wire = QET B Return #1
for SQUET-end rerouting card:
add jumper from Pin 1 (Feedback Return B) to Pin 47 (QET B Return #1)
break off Socket 47
for D50-end rerouting card:
jump Pin 22 (QET B Return #1) on the male side (stripline side) to Pin 33 (Feedback Return B) on the female side (ebox side)
open switches (to break connections) corresponding to Pin 22 (switch U03-1) and Pin 33 (switch U10-3)
| 1530 | Finish fixing Stripline 19 rerouting boards |
| 1700 | All DIBs pass electrical checks at breakout box. Some conductances to chassis are rather high, up to 4.5 nS. |
| 1827 | Place Cf source on IVC. |
Next Day