2022/10/05 (Wednesday)
- Lab in-personnel: Giulia
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors. PuBe source behind lead wall on West side of lead/poly shield. |
| NaI trigger window: 7.6-11.2 MeV | |
| Warmed fridge yesterday for twelth 5K pumpout. Turbopumping IVC overnight. | |
| 1700 | Fill LN2 cold trap bath |