UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20161030

2016/10/30 (Sunday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters → cables 1,2,3 → HV board inputs 1,3,2 → HV board outputs 1,2 → DCRC55(1)/50(3)
1146 Return Cf source to safe.
1150 Tower = 31.8 mK, Still = 130 μbar, G1/G2 = 165/145 mbar, 1K Pot = 1.76 K / 80 mbar. MB = 30.1%.
1152 Fill LN2 cold trap bath.
1202 Commence LHe transfer (29.3%)
1246 Cease LHe transfer (90.8%)
1256 Release MB pressure.
1330 Release MB pressure.
1356 Place Cf source @ fridge.

Next Day