2022/05/11 (Wednesday)
- Lab in-personnel: Matt
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| 1355 | MC/Coldplate = 28.4/146 mK, Still = 1.09 K / 0.100 mbar / 0 mW, G1/G2 = 106/101 mbar, 1K Pot = 18° / 1.56 K / 9±1 mbar, MB = 70.3% |
| 1355 | Goldman = 72.7 mK @ 200 uV excitation |
| 1400 | Fill LN2 cold trap bath |