| Status | Run 74 prep. 1K Pot pumped out and isolated. Fridge and 4He and LN2 Trap 1 isolated, not pumped out. Cryostat vacuum jacket pumped out. IVC open, tower installation in progress. |
| 0930 | Zach body temp = 98.3 |
| 0945 | Zach enters lab |
| 1010 | Continue Tower installation - insert and torque 30mK can screws, then proceed to 100mK stage. |
| 1100 | Attaching 100 mK shield, heat sinks. |
| 1130 | Finish 100 mK stage. Attach screw for 600 mK rod. Begin attaching 4K stage. |
| 1145 | Finish attaching 4K stage. Put covers over unused Tower faces 3, 6, 1. |
| 1155 | Attach all six 4K heat sinks |
| 1155 | Zach exits lab |