UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20200219

2020/02/19 (Wednesday)

Previous Day

Status Initial LHe transfer yesterday. Beginning Run 72 cooldown.
0835 MC(H35)/Sorb/1K Pot = 5.28/8.5/6.72 K. All creeping upward overnight. G1(fridge) = 537.3 mbar (3He pump off).
0840 Tower = 5.26 K. (Coldplate/Still = 17.4/11.4 K. These clearly don't have good calibrations here.)
0840 MB = 65.8% / 185 mbar
0845 Motor A/B = 33.0/24.9 Ω, superconducting. Screw terminal connection 29.4 Ω, also presumably the NbTi is now superconducting.
0850 Turbo on IVC = 4.0 nbar. With turbo valved out for a minute, IVC = 46 nbar. Open Turbo valve again, we'll keep pumping on IVC.
this is a little better than the last successful cooldown.
0850 Fill LN2 cold trap bath from bomb Dewar.
0855 Pump out line leading to 1K Pot with scroll pump
0900 Switch over to 4He pump. Turn on 4He pump then change pump exhaust to recovery and open valve to recovery lines.
0900 Check pressure in 1K Pot by closing V4A and opening 1K Pot speedivalve: the mechanical gauge goes up about 0.33 bar. 1K Pot temp falls to 4.0 K.
0910 Pump out 1K Pot in steps, alternating between V4a and the 1K Pot speedivalve. After 8 iterations get pot down to around 0.13 bar. Then leave V4a open and open 1K Pot speedivalve gradually. Leave 4He pump pumping on pot continuously.
0915 Tower/MC(H35)/Sorb = 5.23/5.19/4.0 K. MC falling. G1(fridge) = 474.4 mbar, falling.
0915 1K Pot = 3.06 K / 3.0 mbar.
0920 Open 1K Pot needle valve → 10°. 1K Pot → 2.6 K / 10 mbar. MC temperature starts falling much faster.
Open 1K Pot needle valve → 20°. 1K Pot → 2.5 K / 16 mbar. MC(H35) = 3.33 K
0925 Open 1K Pot needle valve → 30°. 1K Pot → 2.5 K / 22 mbar. G1(fridge) = 393.3 mbar
Open 1K Pot needle valve → 40°. 1K Pot → 2.5 K / 30 mbar.
0935 MC(H35) = 2.89 K, Fridge(G1) = 261 mbar. 1K Pot = 2.41 K / 30 mbar.
0940 1K Pot pressure suddenly spikes up above 400 mbar, wavers between 200 and 400 mbar.
MC(H35) = 2.69 K, Fridge(G1) = 204 mbar
0945 1K Pot = 2.31 K / 300±50 mbar.
Last time the 1K Pot was colder at this point, below 2 K. But the MC is cooling more slowly too, maybe because of the heavier payload. So that may be a drag on the pot cooling. At least the 1K Pot temperature is falling, albeit slowly.
1000 MC(H35) = 2.50 K, Fridge(G1) = 147 mbar. 1K Pot = 2.24 K / 350±30 mbar.
1030 MC(H35) = 2.47 K, Fridge(G1) = 139 mbar. 1K Pot = 2.20 K / 350±30 mbar. Everything seems to have flattened out, that's a little annoying.
we can compare to Run 70 which had the GeHV detector and the aluminum electrode. It was colder by this time. So not sure what the problem is here.
I guess I'll try circulating. Note that currently 3He pump is off and and dump is open to cold LN2 Trap 1 and to fridge.
1040 Close V3 and V9, leaving 104 mbar (G2) in the dump. Turn on 3He pump.
G1/G2 settle at 145/114 mbar
1040 Start circulation through Trap 1. V6 → 12.8%. 1K Pot temp/press shoot up, MC temperature falls rapidly to 1.77 K (below lambda point). Condenser peaks at 435 mbar. 1K Pot peaked to 2.7 K / off-scale mbar, then starts to settle again.
1045 MC(H35) = 1.74 K, G1/G2 = 304/278 mbar and falling, 1K Pot = 2.45 K / 200±30 mbar.
1050 V6 → 13.0%. No impact on condenser (continues to fall) or 1K Pot
1100 MC(H35) = 1.78 K (rising), G1/G2 = 184/160 mbar and falling, 1K Pot = 2.28 K / 350±30 mbar.
1105 V6 → 13.3%. Condenser peaks at 265 mbar. 1K Pot pressure spikes and recovers. MC(H35) falls, → 1.61 K.
1110 MC(H35) = 1.59 K, G1/G2 = 258/232 mbar and falling, 1K Pot = 2.36 K / 300±30 mbar.
1110 V6 → 13.5%. Condenser peaks at 280 mbar. Still pressure (P1) now in range, → 200 mbar and falling. 1K Pot pressure spikes and recovers. MC(H35) falls, → 1.50 K.
1115 MC(H35)/Tower = 1.50/1.51 K, G1/G2 = 277/251 mbar, Still = 130 mbar, 1K Pot = 2.36 K / 260±30 mbar.
1120 V6 → 13.8%. Condenser peaks at 295 mbar. Still pressure (P1) falls → 24 mbar. 1K Pot rises a little. MC(H35) falls, → 1.39 K.
1125 MC(H35) = 1.38 K, G1/G2 = 288/260 mbar, Still = 22 mbar, 1K Pot = 2.34 K / 270±30 mbar.
1130 V6 → 14.2%. Condenser peaks at 310 mbar. Still pressure (P1) falls → 9 mbar. 1K Pot rises a little. MC(H35) falls, → 1.29 K.
so cooldown looks ok, but 1K Pot and circulation pressures much higher than usual. I suspect the warmer pot is leading to the higher mixture pressures. Why is the pot running so warm? We can try adjusting the needle valve later.
1135 MC(H35) = 1.31 K, G1/G2 = 307/278 mbar, Still = 9 mbar, 1K Pot = 2.35 K / 300±20 mbar.
1140 V6 → 14.5%. Condenser peaks at 315 mbar. MC wavered around 1.28 K but then quickly fell to 1.15 K (below Al Tc it seems). That caused a second increase in Condenser pressure, from 312→316 mbar.
1145 MC(H35)/Tower/Coldplate/Still = 1.16/1.17/1.87/1.84 K, G1/G2 = 315/284 mbar, Still = 6 mbar, 1K Pot = 2.36 K / 300±20 mbar.
1150 Condenser pressure (318 mbar) and MC temperature (1.24 K) are both increasing slowly…
1150 Try closing 1K Pot needle valve → 30°. Pot T&P fall, → 2.33 K / 55 mbar. Condenser pressure starts falling, MC temperature rise slows down.
1155 MC(H35) = 1.25 K, G1/G2 = 312/281 mbar, Still = 6 mbar, 1K Pot = 2.32 K / 55 mbar.
1155 V6 → 14.8%. Condenser peaks at 315 mbar. MC spikes to 1.35 K, then bounces around 1.23 K, then falls below 1.1 K (maybe that was the final struggle to get Al electrode below Tc?). Condenser pressure oscillates a little between 315 and 318 mbar.
1200 MC(H35) = 0.98 K and falling, G1/G2 = 314/282 mbar, Still = 4.5 mbar, 1K Pot = 2.33 K / 55 mbar.
1210 MC(H35)/Tower/Coldplate/Still = 0.76/0.78/1.01/1.80 K, G1/G2 = 296/266 mbar and falling, Still = 4.5 mbar, 1K Pot = 2.31 K / 55 mbar.
1215 V6 → 15.1%. Condenser peaks at 297 mbar. MC falls more quickly, → 0.61 K. Still → 3.8 mbar.
1220 MC(H35) = 0.55 K, G1/G2 = 292/261 mbar, Still = 3.6 mbar, 1K Pot = 2.30 K / 55 mbar.
1240 MC(H35)/Tower/Coldplate/Still = 0.50/0.51/0.70/1.76 K, G1/G2 = 278/247 mbar, Still = 3.6 mbar, 1K Pot = 2.28 K / 55 mbar.
1240 V6 → 100%. Condenser peaks at 298 mbar. MC falls more quickly, → 0.30 K. Still → 0.4 mbar. 1K Pot temp rises a little.
1250 MC(H35) = 68 mK, G1/G2 = 233/206 mbar and falling, Still = 0.3 mbar, 1K Pot = 2.30 K / 50 mbar.
1310 MC(H35)/Tower/Coldplate = 34.8/84.2/194 mK, G1/G2 = 163/141 mbar, Still = 1.60 K / 0.24 mbar, 1K Pot = 2.23 K / 55 mbar.
1320 Tower = 78.0 mK, G1/G2 = 164/142 mbar, Still = 0.24 mbar, 1K Pot = 2.24 K / 55 mbar.
1325 Open V14 to let the remaining mix out of the dump and into circulation. P1(Still) rises off scale, falls again after a a minute. Condenser peaks at 355 mbar. Tower → 140 mK and rising. 1K Pot temp/press spike to 2.62 K / 250 mbar, pressure falls back to 50 mbar but temperature falls more slowly.
1330 Tower peaked at 155 mK then started falling again. Condenser pressure and 1K Pot temperature both falling.
1350 Tower = 77.8 mK, G1/G2 = 147/126 mbar, Still = 0.80 mbar, 1K Pot = 2.21 K / 55 mbar.
1350 Close V14
1435 Screw terminal test. Set up circuit with DC supply, 200 Ω resistor, Fluke multimeter as ammeter, and screw terminal leads in breakout box. Increase power in steps, see if the tower temperature increases. We saw an increase at a few mA and above - generally T rose for a couple minutes then leveled out.
V_supply [V] I_sc [mA] Tower temp [mK] wait time [min]
0 0.0 74.9
0.1 0.62 74.8
0.8 3.77 75.7 2.5
1.5 6.74 77.8 2.0
1.5 6.77 78.9 6.0
2.3 10.32 83.8 2.0
3.4 15.12 98.3 4.0
Compare with Run 71 test on motor coils. We can definitely apply more DC current to the screw terminal setup without much heating.
1500 Work out connections for HV board. Looks like we have DIB 1/3/4 → Stripline 43/41/48 → Cable 3/2/1 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2. This presents a bit of a problem because the accessory interposer board has an extension to the right, but HV Connector 2 is on the left, so the extension interferes with the middle connector. It looks like we can put a “blank” interposer between HV board and accessory interposer, and that will leave room for the other cable connections.
1535 Plug DCRCs into HV box: HV 1/2 → DCRCX(4)/DCRC55(1)
1540 Start MIDAS. Set up ODB. Set DCRC1 as master.
1620 After some fiddling, get MIDAS running and the ODB set up for data from both DCRCs. See some live channels and even a few pulses on DCRC1.
1640 Set phonon settings on both DCRCs to match an ODB file from Run 70. Check channels - a couple have sorta weak pulses (temperature is high), the rest are railed and far off on their offsets.
1650 Zap SQUIDS. The tool didn't work with DCRCs set to “1, 4” but I could ZAP them separately.
1700 Stop MIDAS programs and unplug DCRCs.
1700 Bent a pin on cable gender changer 3 when I connected cable 3. This probably was causing problems with DCRC4. Swapped with gender changer 4.
1705 Tower = 73.1 mK, G1/G2 = 145/125 mbar, Still = 0.24 mbar, 1K Pot = 2.21 K / 55 mbar.
1705 MB = 51.5%
1705 Fill LN2 cold trap bath from 25L bomb Dewar
1710 Tower = 72.1 mK. Cooling after disconnecting the DCRCs, was running around 75.5 before the zap, maybe 74 after.

Next Day