2021/12/18 (Saturday)

Previous Day

  • Lab in-personnel: Himangshu
Status Run 75 in progress
Setup Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4)
1305 Goldman/Tower/MC(H35)/Coldplate = 49.1/89.8/36.6/221 mK, Still = 1.70±0.02 K / 0.130 mbar / 0 mW, G1/G2= 182/162.4 mbar, 1K Pot = 1.634 K / 22 mbar. MB = 61.7%
1325 Started filling LN2 cold trap bath
1332 Completed filling LN2 cold trap bath