Previous Day

  • Lab in-personnel: Pramod
Status Run 74 in progress. First cooldown aftr IVC rebuild.
Tower thermometer is reading high, probably this is a thermometer problem and the actual temperature is much lower. High noise in some of the charge channels.
Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → nothing/Source_mover_board+HV_diverter_board → DCRC50(3)/55(1). Kepco 40V supplye → HV BNC. No lead/poly shield. Currently both DCRCs are on.
1327 Tower/MC/Coldplate = 133.7/35.7/193 mK, Still = 1.40 K / 0.08 mbar / 0 mW, G1/G2= 280.4/256.9 mbar, 1K Pot = 1.62 K / 20±1 mbar. MB = 27%.
1337 Fill LN2 cold trap bath.
1407 Begin LHe transfer @ MB = 27%
1443 End LHe transfer @ MB = 90.3%

Next Day