| Status | Run 74 in progress. |
| | Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → nothing/motor_board+HV_board → DCRC50(3)/55(1). No lead/poly shield. |
| 1237 | MB = 28.0% |
| 1205 | Tower = 97.3 mK |
| 1301 | Start 31min series of 5V data (bias applied after 1 min), with 1000 beginning randoms, trigger threshold 50/50/50/50 on DCRC3qI/qO/DCRC1qI/qO, 5 Hz in-run randoms, with 1.6384 ms pulses (8192 length) and 400 us prepulse (500 length).
Use sequence r74_takeandflash_dcrcbias.msl |
| 1337 | MB = 26.6% |
| 1450 | Matt enters lab |
| 1455 | Tower/MC/Coldplate = 98.5/30.9/188 mK, Still = 1.43 K / 0.130 mbar / 0 mW, G1/G2= 182/173 mbar, 1K Pot = 1.68 K / 36±2 mbar. |
| | Found the gasket for the cap for the transfer line lance lying on the floor. Must have fallen out during the last transfer. Pushed it back into the cap.
|
| | Put a piece of rubber hose in the hook for the scale to weigh the Dewar, so it would hang higher and the wheel wouldn't touch the ground.
|
| 1527 | Begin LHe transfer @ MB = 22.8% |
| 1557 | End LHe transfer @ MB = 90.9% |
| 1630 | MB = 90.8 % |
| 1645 | Fill LN2 cold trap bath |
| 1655 | Matt exits lab |