| | Setup: DIB1/3/4 → 3.2 MHz filters 3/1/2 → cable 3/1/2 →gender changer 3/1/2 → HVConn 1/3/2 → HV 1/2 → DCRC55/DCRC33 |
| 1548 | Fill LN2 cold trap full. LN2 dewar was empty, will refill. |
| 1555 | Tower/MC/Coldplate = 32.5/30.3/192 mK, Still = 1.2 K / 0.110 mbar, G1/G2 = 250/220 mbar, 1K Pot = 1.690 K / 26 mbar, Main bath = 27.7%. Boil off rate: faster than slow mode (predicted level: 32.5%). |
| | Recovery meter: 17000 cuft, right dial pointing to right, rate of meter: 0.33 cuft/min. Meter turned to 17100 at approximately 3:57PM, faster than expected (between 4:10-4:30PM). |
| 1630 | Start LHe transfer (MB = 26.5%). |
| 1747 | Top off LN2 cold trap. |
| 1812 | End LHe transfer (MB = 91.8%). |