| Status | Run 75 finished. 1K Pot pumped dry and isolated. All mixture in dump, fridge isolated. LHe Trap and LN2 Trap 1 still have contaminants. ~1 atm exchange gas in IVC. Cryostat Vacuum Jacket pumped out. Main bath in pit, clean tent erected, IVC not yet open. |
| 1220 | MC(Cernox) = 297 K |
| 1230 | Wipe down inside of clean tent to remove dust |
| 1240 | Begin removing bottom section of IVC
 |
| 1245 | Plug Cable 1 into breakout box and double-check cross-channel resistances. They are about the same as the original room-temperature check. About 1800 Ohm for the two cases that are same-side channels (pC-pF on both sides) and about 2800 Ohm for resistances between opposite-side channels. |
| 1300 | Remove bottom piece of IVC. |
| 1345 | Remove 4K heat sinks |
| 1430 | Deinstall squets |
| 1450 | Remove 4k Stage |
| 1515 | Remove 100mK stage |