Status: Initial LHe transfer yesterday. IVC turbopumping overnight. Some mixture is in fridge, open to LN2 Trap 1. Trap 2 is at room temperature after yesterday's cryocleaning.
0855 MC(Cernox)/Sorb/1K Pot = 4.67/8.6/6.55 K, Turbo/IVC = 1.9/16 nbar, Fridge(G1) = 440 mbar. Main bath=69.5%
Because of the leak at the stripline tube, we will pump continuously on the IVC during this run.
Boiloff rate: a little faster than slow mode
0905 Measure Trap 2 contaminants at G1: 14.8 mbar, after 60 minutes of cryocleaning yesterday. Pump out Trap 2 with scroll pump.
0915 Put Trap 2 back into LN2 bath. Fill LN2 cold trap bath.
note: Trap 2 is now cleaner than Trap 1. Trap 1 still has mixture in it.
0920 Open dump to Trap 1 (v9, v13a), let settle. Open v1 to let mix into LHe trap, let settle. Open condenser valve to let mixture into condenser side of fridge.
0925 Open 1K Pot speedivalve. Pressure on mechanical gauge on pot pumping lines rises to about 1/3 bar. This should be the He we let into the pot yesterday. Open v4a, mechanical gauge falls to about 0.23 bar.
1K Pot temperature falls below 5 K when speedivalve opened, falls again when v4a opened, then starts to rise back above 6 K
0935 Start 4He pump, open recovery valves for 4He pump, then open pump valve and v4a to start pumping on 1K Pot, needle valve still closed. 1K Pot falls to about 5 K, then rises again to around 6 K, pressure falls to 0.045 mbar.
0935 Open 1K Pot needle valve about 10 degrees. 1K Pot → 3.4 K / 2.8 mbar
Open needle valve a few more degrees. 1K Pot → 3.2 K / 4 mbar.
Open needle valve a few more degrees. 1K Pot → 3.0 K / 8 mbar.
Open needle valve a few more degrees. 1K Pot → 2.7 K / 17 mbar. MC temperature dropping.
Open needle valve a few more degrees. 1K Pot → 2.5 K / 26 mbar.
0945 MC(Cernox) = 3.2 K and falling. Fridge(G1/G2) = 475 mbar and falling.
1040 MC(Cernox) = 2.0 K, Fridge(G1/G2) = 80 mbar and falling, 1K Pot = 1.70 K / 26 mbar and oscillatory
Still/ColdPlate = 2.4/3.2 K
1045 Still gate valve was not open, open it now. G1/G2 fall a bit, 1K Pot reacts a bit.
1050 Tweak 1K Pot needle valve open a little more before starting circulation. 1K Pot → 1.72 K / 38 mbar
1050 Close v9 with G2 reading 61 mbar, so 61 mbar left in dump.
1055 Start circulation through Trap 1, v6 = 12.6%
1100 v6 → 13.0%. Condenser(G1/G2) → 90 mbar (peak), MC(Cernox) → 1.90 K (and falling)
1110 v6 → 13.3%. Condenser(G1/G2) → 220 mbar (peak), MC(H35) → 1.67 K (and falling). Still/ColdPlate = 1.9/2.4 K
H35 thermometer shifted upward after switching to Still/ColdPlate then back. Had fallen to 1.62 K but then shifted up to 1.71 K. It's still falling but apparently more slowly.
1120 H35 fell to 1.65 K but then increased to 1.69 K, then falling again. Perhaps these are oscillations as the phase separation begins.
1120 v6 → 13.6%. Condenser(G1/G2) → 290 mbar (peak), MC(H35) → 1.38 K (and falling), ColdPlate = 1.55 K, Still = 1.33 K / 5.5 mbar.
1K Pot has been steady at 1.71 K / 36 mbar
1135 v6 → 14.0%. Condenser(G1/G2) → 165 mbar (flat), MC(H35) → 830 mK (and falling), Tower = 811 mK, ColdPlate = 0.91 K, Still = 1.13 K / 3.4 mbar.
1145 v6 → 15.5%. Condenser(G1/G2) → 180 mbar (peak), Tower → 300 mK (and falling), ColdPlate = 440 mK, Still = 1.09 K / 0.65 mbar.
1200 v6 → 100%. Condenser(G1/G2) → 170 mbar (peak), Tower → 100 mK (and falling), ColdPlate = 197 mK, Still = 1.03 K / 0.14 mbar.
1215 Open v14 to pull mixture left in dump into circulation. G1/G2 140 → 220 mbar, then fall again. Still pressure maxes out but then falls to < 20 mbar. Tower 85→140 mK and rising.
1238 Tower=72.5mK, G1/G2= 116/118 mbar, P1=0.85, 1K pot =34 mbar/1.71K
Close v14.
1305 Tower/MC/Coldplate = 68.1/37.4/198 mK, Still = 1.28(?) K / 0.110 mbar, G1/G2 = 115/120 mbar, 1K Pot = 1.71 K / 34 mbar.
1350 Tower/MC/Coldplate = 67.5/35.2/190 mK, Still = 1.1 K / 0.110 mbar, G1/G2 = 115/120 mbar, 1K Pot = 1.71 K / 34 mbar.
Tower seems to be cooling very slowly, lagging behind MC. Does silicon take longer to cool than germanium?
1500 Tower/MC/Coldplate = 67.0/35.1/192 mK, Still = 1.2 K / 0.110 mbar, G1/G2 = 115/120 mbar, 1K Pot = 1.71 K / 36 mbar. Still thermometer is a little unstable.
1550 Fill LN2 cold trap bath
1550 Main bath = 58.5%. Boiloff rate since this morning is between slow- and fast-mode

Next Day