2019/04/12 (Friday)
| Status | Warming. All mixture in dump. LN2 traps warm. 1K Pot needle valve open. Nitrogen exchange gas in IVC. Nitrogen and helium exchange gas in cryostat vacuum jacket for fast warmup. |
|---|---|
| 1010 | MC(Cernox) = 252.7 K Warming time constant is about 15 hours. At this rate the fridge will reach dew point (285 K) Saturday 6:10 AM. |
| 1640 | MC(Cernox) = 268.4 K Warming time constant is about 15 hours. At this rate the fridge will reach dew point (285 K) Saturday 6:00 AM. |
| 1640 | IVC = 0.66 atm. |
Working on 4He Pump rebuild.