2022/08/29 (Monday)

Previous Day

  • Lab in-personnel: Matt, Zach
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe behind lead wall on West side of lead/poly shield.
3rd 5K pumpout yesterday. IVC has been pumping out overnight.
0930 MC/1KPot/Sorb = 6.01/6.98/8.9 K
0950 Turbo on IVC = 1.4 nbar. With Turbo valved out for 1 minute IVC = 12 nbar.
0955 Turn on 4He pump. Open Recovery valve to 4He pump. Check pressure in 1K Pot (with V4a open, 4He pump inlet valve closed). 1K Pot = 0.23 bar on mechanical gauge.
0955 Pump out 1K Pot in stages, alternating 1K Pot Speedivalve and V4a, opening V4a in brief spurts to keep 4He pump pressure low.
1000 Start pumping 1K Pot continuously
MC and 1K Pot cooling
1045 MC = 3.42 K, cooling slowly. 1K Pot = 3.27 K / 1.7 mbar, cooling slowly
1045 Open 1K Pot needle valve → 15°. 1K Pot → 2.95 K / 5.5 mbar
1050 Open 1K Pot needle valve → 30°. 1K Pot → 2.65 K / 10 mbar
1105 Open 1K Pot needle valve → 45°. 1K Pot → 2.24 K / 15 mbar
1110 MC/Sorb = 2.95/4.0 K. G1(Fridge+Dump) = 240 mbar and falling.
1255 MC = 1.80 K. G1(Fridge+Dump) = 41 mbar and falling. 1K Pot = 1.61 K / 15+-1 mbar
1410 MC = 1.76 K. G1(Fridge+Dump) = 36 mbar and falling. 1K Pot = 1.60 K / 15+-1 mbar
1410 Turn on 3He pump
1420 Fill LN2 cold trap bath (a bit overdue maybe)
1440 Close V3 and V9, leaving 40 mbar mixture in dump
1435 Start circulation through Trap 1. V6 → 12.6%. Condenser peaks at 229 mbar. MC(H35) → 1.46 K. Still → 1.51 K / 60 mbar.
1445 V6 → 13.0%. Condenser(G1) peaks at 319 mbar. MC(H35) → 1.34 K. Still(P1) → 1.38 K / 12 mbar.
1500 V6 → 13.4%. Condenser(G1) peaks at 283 mbar. MC(H35) → 1.15 K, bouncing around a bit. Still(P1) → 1.20 K / 3.6 mbar.
MC hanging around 1.17 K
1510 V6 → 13.8%. Condenser(G1) peaks at 227 mbar. MC(H35) → 1.08 K, looks like we got past the Al transition. Still(P1) → 1.20 K / 3.2 mbar.
1520 V6 → 14.4%. Condenser(G1) peaks at 244 mbar. MC(H35) → 0.44 K. Still(P1) → 1.17 K / 1.3 mbar.
1535 V6 → 15.0%. Condenser(G1) peaks at 231 mbar. MC(H35) → 0.21 K. Still(P1) → 1.17 K / 0.5 mbar.
1550 V6 → 100%. Condenser(G1) peaks at 216 mbar. MC(H35) → 76 mK. Still(P1) → 1.13 K / 0.11 mbar.
1600 Open V14 to pull the remaining mixture out of the Dump and into circulation
Condenser peaks at 245 mbar then falls again. MC rises to 95 mK then falls again. 1K Pot rises too.
1613 Begin LHe transfer @ MB = 35.5%
1620 MC/Coldplate = 37.6/149 mK, Still = 1.11 K / 1.10 mbar, 1K Pot = 1.66 K / 31±2 mbar
1635 MC/Coldplate = 29.7/146 mK, Still = 1.10 K / 0.5 mbar, 1K Pot = 1.58 K / 15±2 mbar
1635 Close V14
1703 Ended LHe transfer @ MB = 91.9%
1715 MC/Coldplate = 27.5/145 mK, Still = 1.10 K / 0.075 mbar, 1K Pot = 1.58 K / 15±2 mbar
1720 Open LN2 Dewar vent to very low flow rate, connect to E-box purge bag
1745 Power DCRCs 1&3 and turn on DAQ programs. Enable DCRCs 1,2,3 so that we can watch traces while adjusting HV.
1750 Set QET biases to Aug 25 values, after the last 5K pumpout. Pulses look pretty good in all channels.
1805 Adjust offsets to get all baselines near -0.80 V
1925 MC has settled at 28.6 mK after turning on DCRCs
Let's try -100V nominal, see how the leakage looks
1939 Dial HV up to -115V nominal, -112.9V actual, for 15% prebias, using RootSequencer
Vtest falls for about 4 minutes, then rises to a new plateau - looks about like it did the last time.
1945 Dial HV down to -100V nominal, -97.9V actual
1955 HV = -97.9 V, Vtest = -31.5 mV, Ileak = -34.7 uA, Vdet = -84 V (86%).
this is close to what we saw last time (Aug 27) - or slightly worse.
Meanwhile phonon channels all look pretty decent.
1957 Dial HV down to -90V nominal, -88.0 V actual
2005 HV = -88 V, Vtest = -23.1 mV, Ileak = -25.4 uA, Vdet = -77.9 V (88%).
also worse than last time
2005 Dial HV down to 0V

Next Day