2017/08/06 (Sunday)
| Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4) | |
| 1132 | Tower = 26.5 mK, Still = 0.060 mbar, G1/G2 = 143/133 mbar, 1K Pot = 1.68 K / 25 mbar. MB = 30.2% |
| 1136 | Begin LHe transfer @ MB = 30.2%. |
| 1155 | MB level not increasing - because I forgot to close recovery line from dewar. Stupid. Now it's closed. |
| 1240 | Finish LHe transfer @ MB = 92.3% |
| 1245 | Fill LN2 cold trap bath |