UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170806

2017/08/06 (Sunday)

Previous Day

Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4)
1132 Tower = 26.5 mK, Still = 0.060 mbar, G1/G2 = 143/133 mbar, 1K Pot = 1.68 K / 25 mbar. MB = 30.2%
1136 Begin LHe transfer @ MB = 30.2%.
1155 MB level not increasing - because I forgot to close recovery line from dewar. Stupid. Now it's closed.
1240 Finish LHe transfer @ MB = 92.3%
1245 Fill LN2 cold trap bath

Next Day