| Status: IVC pumping over weekend. Mixture cryocleaned 1 time. Beginning 2nd attempt at Run 71 cooldown. | |
| 0900 | Turbo pump on IVC = 25 nbar. IVC = 1 μbar with turbo valved out for several minutes. |
| 0910 | Check warm LN2 Cold Trap 1: 7.1 mbar. Pump out Trap 1. |
| 0925 | Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.5% |
| 0930 | Increase V6 → 12.6% to restart flow |
| 0935 | Increase V6 → 12.7% to restart flow |
| 0935 | Increase V6 → 12.8% to speed up flow |
| 0950 | Pump IVC with leak detector, turbo valved out. IVC = 7.1 pbarL/s. |
| 0950 | Increase V6 → 12.9% to speed up flow |
| 1005 | Leak check IVC, squirting all joints. No increase in leak signal. |
| 1025 | Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 560-740 mbar. Pump mixture to dump. Removed 11.2 mbar. |
| 1120 | Check warm LN2 Cold Trap 1: 11.2 mbar. Pump out Trap 1. |
| 1140 | Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.8% ← no, too high, pressure rises too high, start over. |
| 1145 | Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.9% |
| 1155 | Increase V6 → 13.0% to restart flow |
| 1200 | Increase V6 → 13.1% to restart flow |
| 1225 | Increase V6 → 13.2% to speed up flow |
| 1235 | Increase V6 → 13.3% to speed up flow |
| 1245 | Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 560-880 mbar. Pump mixture to dump. Removed 8.8 mbar. |
| 1445 | Check warm LN2 Cold Trap 1: 8.8 mbar. Pump out Trap 1. |
| 1505 | Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.8% |
| 1510 | Increase V6 → 13.0% to restart flow |
| 1520 | Increase V6 → 13.1% to restart flow |
| 1530 | Increase V6 → 13.2% to restart flow |
| 1551 | Increase V6 → 13.3% to restart flow |
| 1645 | Stop cleaning through Trap 1 after 100 min. G2 flow pressure was 565-630 mbar. Pump mixture to dump. Removed 7.7 mbar. |
| 1540 | Check warm LN2 Cold Trap 1: 7.7 mbar. Pump out Trap 1. |