| Setup | Run 73. DIB 1/3/4 → Stripline 43/48/41 → pi-filters 1/2/3 → Cable 3/1/2 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)-master; DCRC33(2) → HV control. DCRCs on overnight. Lead/poly shield erected (4 lead walls, 2 poly walls). |
| 0628 | MB = 32.9%. Predict MB will hit 20% at 13:58. |
| 1300 | Zach body temp = 97.8 |
| 1320 | Zach arrives at lab. |
| 1327 | Tower/MC/Coldplate = 48.9/29.8/183 mK, Still = 1.15 K / 0.095 mbar / 0 mW, G1/G2= 221/232 mbar, 1K Pot = 1.69 K / 50±5 mbar. |
| 1345 | Begin LHe transfer @ MB = 20.4% |
| 1405 | Filled LN2 cold trap dewar. |
| 1420 | Ended LHe transfer @ MB = 92.6% |
| 1443 | MB = 92.6% |
| 1700 | Zach body temp = 98.3 |