| Setup | DIB1/2/4 → 3.2 MHz filters → cable 1/2/3 → gender changer 1/2/3 → movable source controller/board with external Feedback resistor/nothing → DCRC55(1)/DCRC33(2)/DCRC50(3) |
| 1303 | Fill LN2 cold trap full. |
| 1304 | Tower/MC/Coldplate = 34.7/29.8/193 mK, Still = 1.59 K/ 0.130 mbar / 0 mW, G1/G2= 207/182 mbar, 1K Pot = 1.65 K / 28±2 mbar. MB= 24.4% |
| 1320 | Begin LHe transfer. MB = 24.4% |
| 1407 | Finish LHe transfer. MB = 88.8% Had some trouble capping transfer stick during end, lost more He than normal there. |