2022/06/11 (Saturday)
- Lab in-personnel: Zach
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| 1355 | MC/Coldplate = 28.3/145 mK, Still = 1.08 K / 0.100 mbar / 0 mW, G1/G2 = 130/134 mbar, 1K Pot = 45° / 1.55 K / 8.0±0.5 mbar, MB = 37.1% |
| 1405 | Begin LHe transfer @ MB = 37.1% |
| 1410 | Fill LN2 cold trap bath. |
| 1456 | Ended LHe transfer @ MB = 91.2% |