UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20211226

2021/12/26 (Sunday)

Previous Day

  • Lab in-personnel: Himangshu
Status Run 75 in progress
Setup Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4)
Lead shield in place
1636 Goldman/Tower/MC(H35)/Coldplate = 50.28/127.4/37.8/203 mK, Still = 1.64±0.04 K / 0.130 mbar / 0 mW, G1/G2= 230.5/217 mbar, 1K Pot = 1.625 K / 19±1 mbar, MB = 51.4%.
1644 Begin filling LN2
1655 End filling LN2

Next Day