2023/05/17 (Wednesday)
- Lab in-personnel: Himangshu
| Status | Warmup in progress. Added exchange gas on Saturday. Fridge at 273.59 K |
|---|---|
| 1333 | Added two tubelength of He to CVJ since we are not yet at dew point |
| Current warming rate: 0.6 K/hr | |
| 1412 | In order to drop the Main Bath, we need to be at dew point to make sure we donot attract moisture to the electronics. Discussed with Matt and found that since the thermometer is at MC, things might be warmer near the IVC stage. To check that, insert the LN2 rod into the port on top of the fridge and keep it there for 2 minutes. Take the rod out and see how cold it gets. We observed that the rod was cold but it didn't attact moisture and we can hold on the cold part easily. This would mean that we are definitely above freezing so that we won't get frost for sure (which is even worst) . |
| 1422 | Electrical check of ZC-70+interposer after connecting to Stripline 41 on Tower Face 5 | ||||
|---|---|---|---|---|---|
| Cooldown checkout sheet (rev C SQUET) | |||||
| Detector: | S104 | Stripline | 41 | ||
| SC: | none | 300 K 300 K | |||
| Face: | 5 | Date | 04/24/2023 | ||
| SQUET: | ZC-70 | Cable | 2 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | — k | OK |
| SQUID bias B/Ret | 19 | 34 | – k | 0.52 NOT OK | |
| SQUID bias C/Ret | 8 | 24 | – k | 0.43 NOT OK | |
| SQUID bias D/Ret | 23 | 39 | – k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | – k | OK |
| Feedback B/Ret | 2 | 18 | – k | 0.34 NOT OK | |
| Feedback C/Ret | 41 | 25 | – k | 0.3 NOT OK | |
| Feedback D/Ret | 22 | 6 | – k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | – | 0.3, OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | – | 0.24, OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | – | 0.24, OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | – | 0.25, OK | |
| LED 1 | chassis | 42 | 1.0 - 1.1 V | 1.105 | |
| LED 2 | chassis | 26 | 1.69 | ||
| Motor Coil 1 | pBr3 | pBr4 | 7.53 k | ||
| Motor Coil 2 | pCr3 | pCr4 | 7.47 k | ||
| Near Endstop | pAr3 | chassis | 5.714 k | ||
| Far Endstop | pAr4 | chassis | 22.49 k | ||
| Thermometer ROX | pAr1 | pDr4 | 1.8M Ohm | NOT OK |
| 1453 | Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2 | ||||
|---|---|---|---|---|---|
| Cooldown checkout sheet (rev C SQUET) | |||||
| Detector: | S104 | Stripline | 43 | ||
| SC: | none | 300 K 300 K | |||
| Face: | 2 | Date | 4/24/2023 | ||
| SQUET: | ZC-13 | Cable | 3 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | – k | 0.4 OK |
| SQUID bias B/Ret | 19 | 34 | – k | OK | |
| SQUID bias C/Ret | 8 | 24 | — k | 0.2 OK | |
| SQUID bias D/Ret | 23 | 39 | – k | 0.2 OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | – k | OK |
| Feedback B/Ret | 2 | 18 | –1 k | OK | |
| Feedback C/Ret | 41 | 25 | — k | OK | |
| Feedback D/Ret | 22 | 6 | – k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | – | 0.3, OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | – | 0.3, OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | – | 0.3, OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | – | 0.3, OK | |
| 1512 | Electrical check of ZC-39 after connecting to Stripline 48 on Tower Face 3 | ||||
|---|---|---|---|---|---|
| Note: This SQUET need to slanted to make QET B working, seems to be affected by the angle between stripline head connector with the SQUET | |||||
| Detector: | S104 | Stripline | 48 | ||
| SC: | none | 300 K 300 K | |||
| Face: | 3 | Date | 4/21/2023 | ||
| SQUET: | ZC-39 | Cable | 1 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | – k | OK |
| SQUID bias B/Ret | 19 | 34 | – k | OK | |
| SQUID bias C/Ret | 8 | 24 | — k | OK | |
| SQUID bias D/Ret | 23 | 39 | — k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | – k | 0.7, OK |
| Feedback B/Ret | 2 | 18 | – k | OK | |
| Feedback C/Ret | 41 | 25 | – k | 0.4, OK | |
| Feedback D/Ret | 22 | 6 | – k | 0.5, OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | – | 0.3, OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | – | 0.3, OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | – | 0.25, OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | – | 0.25, OK | |
| 1610 | Start removing screws to lower main bath. Loosen medium screws at bottom, two large screws at top, then remove all small screws at top. The shortened 5/16 Allen key that's necessary to remove two screws that are located under fridge insert brackets is kept in the plastic box with the Dewar screws. |
|---|---|
| 1640 | Completely removed main bath screws and lowered main bath |
| 1641 | Observed a little bit of moist surface on the IVC. Can put finger impressions, but not very cold to touch. MC(Cernox) = 277 K and warming faster now. |