2023/05/17 (Wednesday)

Previous Day

  • Lab in-personnel: Himangshu
Status Warmup in progress. Added exchange gas on Saturday. Fridge at 273.59 K
1333 Added two tubelength of He to CVJ since we are not yet at dew point
Current warming rate: 0.6 K/hr
1412 In order to drop the Main Bath, we need to be at dew point to make sure we donot attract moisture to the electronics. Discussed with Matt and found that since the thermometer is at MC, things might be warmer near the IVC stage. To check that, insert the LN2 rod into the port on top of the fridge and keep it there for 2 minutes. Take the rod out and see how cold it gets. We observed that the rod was cold but it didn't attact moisture and we can hold on the cold part easily. This would mean that we are definitely above freezing so that we won't get frost for sure (which is even worst) .
1422 Electrical check of ZC-70+interposer after connecting to Stripline 41 on Tower Face 5
Cooldown checkout sheet (rev C SQUET)
Detector: S104 Stripline 41
SC: none 300 K 300 K
Face: 5 Date 04/24/2023
SQUET: ZC-70 Cable 2
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k — k OK
SQUID bias B/Ret 19 34 – k 0.52 NOT OK
SQUID bias C/Ret 8 24 – k 0.43 NOT OK
SQUID bias D/Ret 23 39 – k OK
Feedback A/Ret 37 21 15 - 25 k – k OK
Feedback B/Ret 2 18 – k 0.34 NOT OK
Feedback C/Ret 41 25 – k 0.3 NOT OK
Feedback D/Ret 22 6 – k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 – 0.3, OK
QET B/Ret 35 29, 33, 47, 48 – 0.24, OK
QET C/Ret 7 5, 9, 10, 28 – 0.24, OK
QET D/Ret 38 36, 40, 43, 44 – 0.25, OK
LED 1 chassis 42 1.0 - 1.1 V 1.105
LED 2 chassis 26 1.69
Motor Coil 1 pBr3 pBr4 7.53 k
Motor Coil 2 pCr3 pCr4 7.47 k
Near Endstop pAr3 chassis 5.714 k
Far Endstop pAr4 chassis 22.49 k
Thermometer ROX pAr1 pDr4 1.8M Ohm NOT OK
1453 Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2
Cooldown checkout sheet (rev C SQUET)
Detector: S104 Stripline 43
SC: none 300 K 300 K
Face: 2 Date 4/24/2023
SQUET: ZC-13 Cable 3
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k – k 0.4 OK
SQUID bias B/Ret 19 34 – k OK
SQUID bias C/Ret 8 24 — k 0.2 OK
SQUID bias D/Ret 23 39 – k 0.2 OK
Feedback A/Ret 37 21 15 - 25 k – k OK
Feedback B/Ret 2 18 –1 k OK
Feedback C/Ret 41 25 — k OK
Feedback D/Ret 22 6 – k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 – 0.3, OK
QET B/Ret 35 29, 33, 47, 48 – 0.3, OK
QET C/Ret 7 5, 9, 10, 28 – 0.3, OK
QET D/Ret 38 36, 40, 43, 44 – 0.3, OK
1512 Electrical check of ZC-39 after connecting to Stripline 48 on Tower Face 3
Note: This SQUET need to slanted to make QET B working, seems to be affected by the angle between stripline head connector with the SQUET
Detector: S104 Stripline 48
SC: none 300 K 300 K
Face: 3 Date 4/21/2023
SQUET: ZC-39 Cable 1
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k – k OK
SQUID bias B/Ret 19 34 – k OK
SQUID bias C/Ret 8 24 — k OK
SQUID bias D/Ret 23 39 — k OK
Feedback A/Ret 37 21 15 - 25 k – k 0.7, OK
Feedback B/Ret 2 18 – k OK
Feedback C/Ret 41 25 – k 0.4, OK
Feedback D/Ret 22 6 – k 0.5, OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 – 0.3, OK
QET B/Ret 35 29, 33, 47, 48 – 0.3, OK
QET C/Ret 7 5, 9, 10, 28 – 0.25, OK
QET D/Ret 38 36, 40, 43, 44 – 0.25, OK
1610 Start removing screws to lower main bath. Loosen medium screws at bottom, two large screws at top, then remove all small screws at top. The shortened 5/16 Allen key that's necessary to remove two screws that are located under fridge insert brackets is kept in the plastic box with the Dewar screws.
1640 Completely removed main bath screws and lowered main bath
1641 Observed a little bit of moist surface on the IVC. Can put finger impressions, but not very cold to touch. MC(Cernox) = 277 K and warming faster now.

Next Day