UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220427

2022/04/27 (Wednesday)

Previous Day

  • Lab in-personnel: Nikki
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRC52(6)
1322 Fill LN2 cold trap bath
1330 MC/Coldplate = 28.5/140 mK, Still = K 1.09 K / 0.110 mbar / 0 mW, G1/G2 = 111/102 mbar, 1K Pot = 18° / 1.57 K / 11±1 mbar, MB = 72.2%
1621 Dial HV up to -251.6 V using RootSequencer for prebias. Set it to rise about 5 V/s with 0.25 second steps.
note this is maximum for the way we set up the HV supply - not quite 15% higher than the intended 220 V
1628 After 5 minutes dial HV down to -221.1 V
1630 Start -221.1 V data series after 5 min 13% prebias, 58 min long, with 1000 initial randoms, 5 Hz in-run randoms, trigger on DCRC3pD threshold 10.
Start series with the Start Button.
1730 Dial HV down to 0V after data series ends.

Next Day