| 1312 | Matt Fritts body temperature = 97.5 F. |
| 1400 | Helped Mike move steel plates to the 4th floor for the PuBe shielding. |
| 1435 | Letting 1 bar of nitrogen into the IVC. |
| 1510 | Opened the e-box, disconnected the striplines and pulled them through to the elbow to get the KF flange o-ring out. Disconnected T-pipe at elbow and pumpout side to do this. |
| 1520 | Polished both surfaces for KF flange. |
| 1603 | Everything is reconnected with new o-ring at elbow KF flange, start pumping down IVC with scroll pump. |
| 1613 | IVC down to 0.1 mbar from scroll pump, switching to turbo pump. |
| 1625 | Tried a leak test, no leaks seen. Will see how it is after sitting overnight. |
| 1630 | Matt leaves lab. |
| 1743 | Matt Fritts body temperature = 98.7 F |
| | as of July 4 07:40, Turbo on IVC = 7.4 nbar |