| Status | Run 77 preparation |
| Setup | DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| | IVC closed and Turbo pumping for a while. No tower - this was just for a leak test. |
| 1205 | Check contents of warm LN2 Trap 1: 13.2 mbar. Pump it out with the scroll pump. |
| 1215 | G1 = 2.2 mbar and stable, stop pumping on Trap 1 |
| 1220 | Place cold trap 1 in the LN2 bath, begin filling with LN2. |
| 1230 | Begin cryocleaning mixture through cold trap 1 |
| 1234 | Open V6 to 12.1% to restart flow |
| 1247 | Open V6 to 12.4% to restart flow |
| 1345 | End cryocleaning, pump mixture to dump. |
| 1402 | G1 = 1.9 mbar and stable. Close all valves and turn off 3He pump, leaving 729.6 mbar in dump. Pull out cold trap 1. |
| 1417 | Check contents of warm LN2 Trap 2: 1.5 mbar. Pump it out with the scroll pump. |
| 1430 | Begin cryocleaning mixture through cold trap 2, V6 at 12.5%. |
| 1536 | Open V6 to 12.6% to restart flow |
| 1600 | Mount sources (stationary Am pellet and movable Am) on the 2d source mover and assemble tower with the two thermometers (new RX-102B-RS and old U02844) on top |
| | |
| 1612 | End cryocleaning, pump mixture to dump. |
| 1627 | G1 = 1.9 mbar and stable. Close all valves and turn off 3He pump, leaving 731.0 mbar in dump. Pull out cold trap 2 |
| 1633 | Cold trap 1 should be warm enough now, check contents: 13.2 mbar. Pump it out with the scroll pump. |
| 1700 | I put cold trap 1 back into the LN2 bath but decided not to do another cryocleaning cycle. |