Previous Day
| Status | Run 77 preparation |
| Setup | Fridge closed, pumping on IVC, preparing for cooldown |
| 1230 | Doing electrical check of all the SQUETS after closing the IVC on Friday. This is a second check to make sure the SQUET connection didn't get loose over time. |
| 1232 | Electrical check of ZC-31 after connecting to Stripline 41 on Tower Face 5 with Cable 2 | | | | |
| | | | | |
| Detector: | S104 | Stripline | 41 |
| SC: | none | 300 K |
| Face: | 5 | Date | 1/30/2023 |
| SQUET: | ZC-31 | Cable | 2 |
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| | | | | | (Gnd lead) |
| | | | | | Nominal: |
| | | | | | < 0.1 nS |
| | | | | |
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.224 k | OK |
| SQUID bias B/Ret | 19 | 34 | | 4.041 k | OK |
| SQUID bias C/Ret | 8 | 24 | | 4.500 k | OK |
| SQUID bias D/Ret | 23 | 39 | | 4.064 k | OK |
| | | | | | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 26.51 k | OK |
| Feedback B/Ret | 2 | 18 | | 26.11 k | OK |
| Feedback C/Ret | 41 | 25 | | 27.98 k | OK |
| Feedback D/Ret | 22 | 6 | | 26.75 k | OK |
| | | | | | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | OL,78,OL, OL, OL | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | | 88, 88, OL, OL | OK |
| QET C/Ret | 7 | 5, 9, 10, 28 | | 81, 76, OL, OL | OK |
| QET D/Ret | 38 | 36, 40, 43, 44 | | 72, 72, OL, OL | OK |
| | | | | | |
| QET A/QET B | 3 | 35 | 1000-3000 | 594 | |
| QET A/QET C | 3 | 7 | | 772 | |
| QET A/QET D | 3 | 38 | | 2163 | |
| QET B/QET C | 35 | 7 | | 523 | |
| QET B/QET D | 35 | 38 | | 1985 | |
| QET C/QET D | 7 | 38 | | 1924 | |
| | | | | | |
| LED 1 | chassis | 42 | 1.0 - 1.1 V | | 1.105 |
| LED 2 | chassis | 26 | | | 1.66 |
| Motor Coil Y1 | | | 169 | | 139 |
| Motor Coil Y2 | | | 169 | | 159 |
| Thermometer Pin1- Pin3 | | | 1k | | - |
| Thermometer Pin2- Pin4 | | | 1k | | 1097 |
Note: Thermometer Pin 3 seems to be open. The solution will be to make a connection between Pin 3 and Pin 4 to read it with the Lakeshore Bridge.
| 1241 | Electrical check of ZC-26 after connecting to Stripline 43 on Tower Face 2 on Cable 3 | | | | |
| | | | | |
| Detector: | S104 | Stripline | 43 |
| SC: | none | 300 K |
| Face: | 2 | Date | 1/30/2023 |
| SQUET: | ZC-26 | Cable | 3 |
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| | | | | | (Gnd lead) |
| | | | | | Nominal: |
| | | | | | < 0.1 nS |
| | | | | |
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.711 k | OK |
| SQUID bias B/Ret | 19 | 34 | | 4.008 k | OK |
| SQUID bias C/Ret | 8 | 24 | | 3.508 k | OK |
| SQUID bias D/Ret | 23 | 39 | | 410 k | NOT OK |
| | | | | | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 1.092 k | OK |
| Feedback B/Ret | 2 | 18 | | 16.73 k | OK |
| Feedback C/Ret | 41 | 25 | | 21.17 k | OK |
| Feedback D/Ret | 22 | 6 | | 20.57 k | OK |
| | | | | | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 201, 119, 113, 114, 149 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | | 83, 75, 86, 78 | OK |
| QET C/Ret | 7 | 5, 9, 10, 28 | | 72, 70, 58, 67 | OK |
| QET D/Ret | 38 | 36, 40, 43, 44 | | 79, 66, 66, 66 | OK |
| | | | | | |
| QET A/QET B | 3 | 35 | 1000-3000 | 826 | |
| QET A/QET C | 3 | 7 | | 1660 | |
| QET A/QET D | 3 | 38 | | 1383 | |
| QET B/QET C | 35 | 7 | | 1745 | |
| QET B/QET D | 35 | 38 | | 1611 | |
| QET C/QET D | 7 | 38 | | 2011 | |
| | | | | | |
| LED 1 | chassis | 42 | 1.0 - 1.1 V | | - |
| LED 2 | chassis | 26 | | | - |
| 1310 | Electrical check of ZC-74 after connecting to Stripline 48 on Tower Face 3 | | | | |
| | | | | |
| Detector: | S104 | Stripline | 48 |
| SC: | none | 300 K |
| Face: | 3 | Date | 1/27/2023 |
| SQUET: | ZC-74 | Cable | 1 |
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| | | | | | (Gnd lead) |
| | | | | | Nominal: |
| | | | | | < 0.1 nS |
| | | | | |
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 5.097 k | OK |
| SQUID bias B/Ret | 19 | 34 | | 4.491 k | OK |
| SQUID bias C/Ret | 8 | 24 | | 4.383 k | OK |
| SQUID bias D/Ret | 23 | 39 | | 4.299 k | OK |
| | | | | | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 368 k | NOT OK |
| Feedback B/Ret | 2 | 18 | | 19.71 k | OK |
| Feedback C/Ret | 41 | 25 | | 18.44 k | OK |
| Feedback D/Ret | 22 | 6 | | 18.74 k | OK |
| | | | | | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 77, 65, 58, 59, 68 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | | 71, 71, 72, 72 | OK |
| QET C/Ret | 7 | 5, 9, 10, 28 | | 55, 64, 54, 68 | OK |
| QET D/Ret | 38 | 36, 40, 43, 44 | | 58, 58, 57, 58 | OK |
| | | | | | |
| QET A/QET B | 3 | 35 | 1000-3000 | 1735 | |
| QET A/QET C | 3 | 7 | | 2535 | |
| QET A/QET D | 3 | 38 | | 2166 | |
| QET B/QET C | 35 | 7 | | 2626 | |
| QET B/QET D | 35 | 38 | | 2243 | |
| QET C/QET D | 7 | 38 | | 1079 | |
| | | | | | |
| LED 1 | chassis | 42 | 1.0 - 1.1 V | | - |
| LED 2 | chassis | 26 | | | - |
| 1410 | Check contents of warm LN2 Trap 1: 7.3 (10 on G1) mbar. Pump it out with the scroll pump. |
| 1420 | G1 = 2.0 mbar and stable, stop pumping on trap 1. |
| 1658 | Raise main bath, install with screws, no issues. |