| Status | Run 75 in progress |
| Setup | Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4) |
| 1130 | Goldman/Tower/MC(H35)/Coldplate = 51.0/158/36.3/218 mK, Still = 1.67±0.04 K / 0.130 mbar / 0 mW, G1/G2= 189/187 mbar, 1K Pot = 1.64 K / 21±1 mbar, MB = 26.9%. |
| 1135 | Fill LN2 cold trap dewar. |
| 1200 | Modify my version of cdmsbats/BatCommon/datareader/RawDataReader.cxx to add a new “modification type” to map the current DCRC configuration to the detector channels in the 12-channel 2-sided setup. |
| 1505 | Install lead/poly shield around fridge - lead on 3 walls, still need to do S wall. |
| 1514 | Begin LHe transfer @ MB = 20.1% |
| 1549 | End LHe transfer @ MB = 91.3% |