| 1245 | Perform mixture throughput test at MC = 300 K using above procedure with 3He pump on. Let G1 rise to 550 mbar before Step 3, then it falls to 42 mbar and starts to rise. Throughput = 6.3 mbar/min. |
| 1250 | Check pressure in 1K Pot: 22 mbar on P2. Pump out with Scroll Pump |
| 1255 | With 1K Pot speedivalve and needle valve closed, pump on Main bath with scroll pump.
Once P2 < 100 mbar (or 2 mbar this time), open 1K pot speedivalve and needle valve (5 turns) to pump out 1K pot volume to < 1 mbar on P2. |
| 1305 | Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar. |
| 1310 | Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar. |
| 1315 | Pressurize main bath and 1K Pot (both sides) with helium to 365 mbar +1atm on G3, then close 1K Pot speedivalve and needle valve. |
| 1320 | Turbo on Cryostat Vacuum Jacket = 0.30 μbar. With Turbo valved out for 1 minute, Cryostat Vacuum Jacket = 19 μbar. |
| 1320 | As on 2021 Feb 16, we will flow mixture through the fridge during LN2 cooldown. Let mixture from dump through cold LN2 Trap 1 to fridge, both sides. Then we'll isolate the sides and circulate with V6 open partially and mix open to dump. V9, V13a, V12a+speedi, V1, Condenser speedi, Still gate valves open, 3He pump on. Now open V6 to 12.8%. |
| 1325 | P1 falls to 0.095 mbar. That's kinda low, let's adjust V6: close completely then open to 12.4%. Before reopening V6 I opened V3 for a moment to repressurize the still. Adjust V6 up a bit, → 12.7%. |
| 1335 | P1 = 0.55 mbar. |
| 1335 | Try closing V12a speedivalve. G1 falls as it should, showing we have throughput. Falls at 11.2 mbar/min . Open V12a speedivalve again. |
| 1345 | MC(Cernox) = 296.2 K, Sorb = >249 K (max), G2/G1/P1 (circulation) = 685/744/0.75 mbar, Level resistor = 0.982 kΩ |
| 1350 | Begin LN2 transfer. LN2 Dewar pressure seems low, we'll try pressurizing it with N2 through the vent like last time. |
| 1355 | Start pressurizing LN2 Dewar through the vent with nitrogen. LN2 Dewar gauge → 10.5 PSI. |
| 1355 | MC(Cernox) = 296.2 K, Sorb = >249 K (max), G2/G1/P1 (circulation) = 685/744/3.2 mbar, Level resistor = 0.982 kΩ |
| | Let's monitor DIB2 (Cable3) qI Feedback to Chassis, to see if the short reappears. |
| 1405 | MC(Cernox) = 295.1 K, Sorb = >249 K (max), G2/G1/P1 (circulation) = 685/744/5.5 mbar, Level resistor = 0.991 kΩ. DIB2 qI FB to Chassis = 0.09 nS. |
| 1415 | MC(Cernox) = 289.2 K, Sorb = >249 K (max), G2/G1/P1 (circulation) = 685/743/15.0 mbar, Level resistor = 0.999 kΩ. DIB2 qI FB to Chassis = 0.09 nS. |
| 1415 | Close V12a speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 11.8 mbar/min. Open V12a speedivalve again. |
| 1440 | MC(Cernox) = 249.9 K, Sorb = >249 K (max), G2/G1/P1 (circulation) = 684/740/offscale mbar, Level resistor = 1.053 kΩ. DIB2 qI FB to Chassis = 0.10 nS. |
| 1440 | Close V12a speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 15.5 mbar/min. Open V12a speedivalve again. |
| 1450 | Turbo on Cryostat Vacuum Jacket = 0.14 μbar. With Turbo valved out for 1 minute, Cryostat Vacuum Jacket = 4.0 μbar. |
| 1505 | MC(Cernox) = 191.2 K, Sorb = >249 K (max), G2/G1/P1 (circulation) = 681/735/offscale mbar, Level resistor = 1.140 kΩ. DIB2 qI FB to Chassis = 0.08 nS. |
| 1515 | MC(Cernox) = 170.9 K, Sorb = >249 K (max), G2/G1/P1 (circulation) = 678/733/offscale mbar, Level resistor = 1.194 kΩ. DIB2 qI FB to Chassis = 0.10 nS. |
| 1515 | Close V12a speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 27.7 mbar/min. Open V12a speedivalve again. |
| 1520 | Matt exits lab |