2020/11/19 (Thursday)

Previous Day

  • Lab in-person: Zach
  • Virtual partner: Michael, Matt
Status Run 73 deinstallation. 1K Pot pumped out and isolated. Fridge and 4He and LN2 Trap 1 isolated, not pumped out. Cryostat vacuum jacket pumped out. IVC at 1 bar. MB in pit, clean tent erected.
1440 Zach body temp = 97.0
1405 Zach enters lab.
1430 Remove IVC bottom piece.
1445 Remove all six 4K heat sinks from tower
1450 Unscrew the SQUID cards from the tower
1455 Disconnect Stripline 48, remove SQUET ZC-13 from West tower face
1505 Disconnect Stripline 43, remove SQUET ZC-68 from SW tower face
1510 Disconnect Stripline 41, remove SQUET ZC-26 with accessory diverter board still attached from East tower face
NOTE: found one pin on diverter board bent out of place…
This appears to be Pin47 on the Stripline side of the SQUET. That would be a redundant pin: it's one of four QETB returns. DIB4. (question: is it one of the diverted wires?)
That's Side1 pB, we didn't have any problems with that channel.
And looks like this pin was not used for an accessory.
1515 Remove diverter board from ZC-26
1525 Remove the two tower face cover plates and the tower center shaft cap
1535 Zach exits lab