2020/11/19 (Thursday)
- Lab in-person: Zach
- Virtual partner: Michael, Matt
| Status | Run 73 deinstallation. 1K Pot pumped out and isolated. Fridge and 4He and LN2 Trap 1 isolated, not pumped out. Cryostat vacuum jacket pumped out. IVC at 1 bar. MB in pit, clean tent erected. |
|---|---|
| 1440 | Zach body temp = 97.0 |
| 1405 | Zach enters lab. |
| 1430 | Remove IVC bottom piece. |
| 1445 | Remove all six 4K heat sinks from tower |
| 1450 | Unscrew the SQUID cards from the tower |
| 1455 | Disconnect Stripline 48, remove SQUET ZC-13 from West tower face |
| 1505 | Disconnect Stripline 43, remove SQUET ZC-68 from SW tower face |
| 1510 | Disconnect Stripline 41, remove SQUET ZC-26 with accessory diverter board still attached from East tower face NOTE: found one pin on diverter board bent out of place… This appears to be Pin47 on the Stripline side of the SQUET. That would be a redundant pin: it's one of four QETB returns. DIB4. (question: is it one of the diverted wires?) That's Side1 pB, we didn't have any problems with that channel. And looks like this pin was not used for an accessory. |
| 1515 | Remove diverter board from ZC-26 |
| 1525 | Remove the two tower face cover plates and the tower center shaft cap |
| 1535 | Zach exits lab |