2019/10/24 (Thursday)
| Status: Installing tower for 2nd attempt at Run 71 cooldown. | |
| 1100 | Continue installation, starting with 100mK stage |
| 1300 | Begin installing 4K shield and SQUET cards |
| 1415 | All three SQUETs/striplines installed, perform electrical checkout |
| DIB2 has problems: SQUID A, FB B/C/D read high or are sporadic. This is SQUET ZC-74 which gave us problems before, have already installed several jumper wires. | |
| 1450 | Disconnect SQUET ZC-74 for troubleshooting. |