UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20191024

2019/10/24 (Thursday)

Previous Day

Status: Installing tower for 2nd attempt at Run 71 cooldown.
1100 Continue installation, starting with 100mK stage
1300 Begin installing 4K shield and SQUET cards
1415 All three SQUETs/striplines installed, perform electrical checkout
DIB2 has problems: SQUID A, FB B/C/D read high or are sporadic. This is SQUET ZC-74 which gave us problems before, have already installed several jumper wires.
1450 Disconnect SQUET ZC-74 for troubleshooting.

Next Day