| 1338 | Turn of 3He pump, pull cold trap 1 out of the LN2 bath. |
| 1415 | Place cold trap 2 into the LN2 bath, turn on the 3He pump |
| 1420 | Begin cryocleaning through cold trap 2 |
| 1423 | Open V6 to 12.4% to start flow |
| 1432 | Open V6 to 12.6% to restart flow, then go back down to 12.5% so that the flow is not too large. |
| 1455 | Open V6 to 12.7% to restart flow, then go back down to 12.4% so that the flow is not too large. |
| 1410 | Started Tower Installation. |
| 1545 | Completed installaing shields for the 100mK Can. Attach Outer first, then inner shield piece. We use medium-sized screws for the heatsinks outer screw-holes, longer screws for inner screwholes of heatsinks and short screws for other screwholes to complete the 100mK shield. |
| 1547 | Attached 600mK rod. |
| 1635 | Stop cryocleaning through LN2 trap 2, pump mixture to dump. |
| 1655 | G1 = 1.5 mbar and stable, close all valves, leaving 723.4 mbar in the dump |
| 1702 | Stop 3He pump and pull cold trap 2 out of the LN2 bath |
| 1715 | After plugging Squet ZC-31 into the tower we saw squid D open and feedback A open, after investigating it seems to be the interposer board was not tight enough |
| | The interposer board does not have a perfectly flush connection, so it can connect to the squet at different angles depending on how you push it, changing the angle seemed to sometimes fix the connection issue but it is fragile |