2020/10/02 (Friday)

Previous Day

  • Lab in-person: Zach
  • Virtual partner: Derek
Setup Run 73. DIB 1/3/4 → Stripline 43/48/41 → pi-filters 1/2/3 → Cable 3/1/2 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)-master; DCRC33(2) → HV control. DCRCs off. Lead/poly shield erected (4 lead walls, 2 poly walls).
Status Warming up to deal with clogged 1K Pot. Mixture in dump, helium in IVC, nitrogen in CVJ. MC/Still heaters = 20/30 mW. 1K Pot pumped out and isolated.
0730 MC(Cernox) = 261.0 K. Rising 1.8 K/hour. Predict 273 K at 15:30
1400 Zach body temp = 97.0
1616 Zach arrives at lab.
1618 MC(Cernox) = 274.0 K
1627 Start pumping on CVJ with scroll pump.
1631 Turn off still and MC heaters.
1637 Scroll pump on CVJ <0.1mbar, switch to Turbo.
1641 Turbo on CVJ = 4 ubar. Leaving overnight to pump.
1642 Zach leaves lab.

Next Day