UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220928

2022/09/28 (Wednesday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe source in storage in PAN443.
NaI trigger window: 7.6-11.2 MeV
Cooled to base yesterday after tenth 5K pumpout. Temperature spikes began at 7:45 am.
1425 MC base 28.3 mK with most spikes peaking below 29.0 mK, some above 29.4 mK
1425 MC/Coldplate = 28.3/149 mK, Still = 1.12 K / 0.110 mbar / 0 mW, G1/G2 = 118/98 mbar, 1K Pot = 45° / 1.59 K / 13±1 mbar, MB = 38.4%
1430 Fill LN2 cold trap bath
1545 Check phonon channels. They look OK. After relocking all baselines are near -0.8 V except DCRC3pA which will need offset adjustment.
1549 Begin LHe transfer @ MB = 37.4%
1600 Fine-adjust phonon offsets to get channels close to -0.80 V
1634 End LHe transfer @ MB = 92.1%

Next Day