UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20230615

2023/06/15 (Thursday)

Previous Day

  • Lab in-personnel: Ping
1210 Check contents of warm LN2 Trap 1: 10.1 mbar (10.5 on G1). Pump it out with the scroll pump.
1222 G1 = 2.2 mbar and stable, stop pumping on Trap 1
1223 Insert LN2 cold trap 1 and begin filling cold trap dewar with LN2
1233 Begin cryocleaning mixture through cold trap 1 following the procedure in procedure:cryoclean_mixture
1237 Open V6 to 12.0% to restart flow
1242 Open V6 to 12.2% to restart flow
1251 Open V6 to 12.3% to restart flow
1303 Open V6 to 12.4% to restart flow
1340 End cryocleaning mixture through trap 1. Pump mixture to dump
1359 P1 = 0.007 mbar, G1 = 1.8 mbar and stable. Close all valves and turn off 3He pump, leaving 717.2 mbar in dump
1405 Remove cold trap 1 from the LN2 bath to warm up overnight

Next Day