| Status | Run 76 finished |
| Setup | DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| | IVC closed and Turbo pumping for a while. No tower - this was just for a leak test. |
| 1335 | Electrical check all Phonon- and LED-related components on SQUET ZC-74. This is the one with the bad middle layer on the FET card and lots of jumper-wire repairs. All components look fine, at the moment. |
| 1430 | Go into cleanroom to examine the 2D Source Mover |
| 1450 | Take video tilting the 2D Source Mover, to see whether it moves when we tilt it. With a somewhat small tilt the mover rotates around the center axis (“X” motor) readily. But the angle produced by the second axis (“Y” motor) stays fixed. |
| 1455 | Confirm that we inadvertently left tape off the collimator, so that in Run76 we had alphas (and maybe low energy electrons) hitting the detector. Put a piece of Kapton tape over the collimator hole to block these next time. |
| 1715 | Do some MIDAS DAQ tests. As it turns out, the sequencer is working - we were able to run a sequence that starts and stops a series. But the SQUID control buttons on the pulse viewer are still not responding. Also tried using tools, e.g. ZAP tool - this did not work. |