2017/10/29 (Sunday)
| Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/3/2 → gender changers → rerouting boards 1/3/4 → DCRC33(2)/DCRC55(1)/DCRC50(3) | |
| 1430 | Tower/MC/Coldplate = 83.0/59.2/360 mK, Still = 1.25 K / 0.20 mbar, G1/G2 = 288/281 mbar, 1K Pot = 1.657 K / 40 mbar. MB = 18.8% |
| 1435 | Fill LN2 cold trap. |
| 1445 | Start LHe transfer (MB = 18.8%) |
| 1547 | End LHe transfer (MB = 91.8%) |