2019/09/18 (Wednesday)

Previous Day

Status: warm, IVC open, preparing for Run 71. Tower assembled. Have cryocleaned mixture 7 times so far.
0950 Check warm LN2 Cold Trap 1: 6.9 mbar. Pump out trap.
1000 Check warm LN2 Cold Trap 2: 2.2 mbar. Pump out trap.
1005 Fill LN2 cold trap bath
1010 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.8%
1025 Increase V6 → 13.2% to restart flow
1045 Increase V6 → 13.3% to speed up flow
1110 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 565-680 mbar. Pump mixture to dump.
Removed 6.7 mbar.
1135 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 13.4%
1140 Increase V6 → 13.5% to restart flow
1150 Increase V6 → 13.6% to speed up flow
1235 Stop cleaning through Trap 2 after 60 min. G2 flow pressure was 570-670 mbar. Pump mixture to dump.
Removed 2.1 mbar.
1255 Check warm LN2 Cold Trap 1: 6.7 mbar. Pump out trap.
1310 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 13.4%
1330 Increase V6 → 13.5% to speed up flow
1410 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 575-650 mbar. Pump mixture to dump.
Removed 4.7 mbar.
1450 Check warm LN2 Cold Trap 2: 2.1 mbar. Pump out trap. (note - trap may have been a little cold)
1505 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 13.2%
1510 Increase V6 → 13.3% to restart flow
1525 Increase V6 → 13.4% to restart flow
1540 Increase V6 → 13.5% to speed up flow
1625 Stop cleaning through Trap 2 after 80 min (longer than intended). G2 flow pressure was 565-705 mbar. Pump mixture to dump.
Removed 3.4 mbar.
1710 Check warm LN2 Cold Trap 1: 4.7 mbar. Pump out trap.
Tower installation
1400 Move tower into clean tent at fridge and begin installation
1500 Install tower, begin to attach 100 mK shields.
Connections to the motorized source wiring at the Tower base level:
1700 During electrical check of DIB3 find that SQUID B is open and QETB is not connected (QETB return lines are OK). Suspect the SQUET, ZC-74. Pin 27 on the stripline side has been trouble, we tried resoldering it. Pin 26 is QETB, right next to it. This one was unstable when we unplugged the SQUET from the tower and messed with it. We'll remove the SQUET and try to repair it.

Next Day