UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20230105

2023/01/05 (Thursday)

Previous Day

  • Lab in-personnel: Himangshu
Status Run 76 finished
Setup DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
IVC closed and Turbo pumping for a while. No tower - this was just for a leak test.
List of Tasks before the next run
1 Detector Control GUI button in Pulse Viewer(SQUID Tuning GUI) is not working
2 ZAP and FLASH in ODB Tools in not working
3 To mount new RuOX thermometer, need new solder joint changes in Diverter Board
4 Fix location of Motor 1 in source mover and test for Motor 2 movements in test bench. One possibility Google doc

Next Day